Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday 04/29/02
|
|
|
0000-0400
|
Beam energy calibration by depolarization
|
Chae
|
Stored beam, no injection
|
0000-0300
|
Controlled Access linac to install the 340-to-N
|
Pasky
|
No injection
|
0300-0600
|
Install water load and cap off pcgun, linac beam ready by 0600
|
Pasky
|
No injection
|
0400-1000
|
thermal imaging on the SR dipole bus, control access with Dipole on
|
Carwar
PS group
|
No beam
|
0700-0900
|
Verify good booster operation with beam
|
Sereno
|
Booster beam
|
0800-0900
|
Investigation of S:IK3 setpoints problem
|
PS group
|
No beam
|
0900-1400
|
RF source test. Switch to RF2 and perform retuning, no beam before 1000
|
Horan
Cherbak
Lenkszus
|
Stored beam and injection
|
1400-1600
|
PAR qualification console test
|
Banks
|
Stored beam and injection
|
1400-1600
|
SR qualification console test
|
Sutton
|
Stored beam and injection
|
1600-2000
|
datapool correction with overlap compensation
|
Emery
Lenkszus
Shang
|
Stored beam and injection
|
2000-2400
|
Multibunch instability study
|
Harkay
|
Stored beam and injection
|
2400
|
Beginning of shutdown
|
OPS
|
No beam
|
|
End of Studies
|
|
|