Machine Studies

Schedule for Run1-15,2002

04/29, 0000 to 2400

Time

Descriptions

Studiers

SRStatus

 

Monday 04/29/02

 

 

0000-0400

Beam energy calibration by depolarization

Chae

Stored beam, no injection

0000-0300

Controlled Access linac to install the 340-to-N

Pasky

No injection

0300-0600

Install water load and cap off pcgun, linac beam ready by 0600

Pasky

No injection

0400-1000

thermal imaging on the SR dipole bus, control access with Dipole on

Carwar

PS group

No beam

0700-0900

Verify good booster operation with beam

Sereno

Booster beam

0800-0900

Investigation of S:IK3 setpoints problem

PS group

No beam

0900-1400

RF source test. Switch to RF2 and perform retuning, no beam before 1000

Horan

Cherbak

Lenkszus

Stored beam and injection

1400-1600

PAR qualification console test

Banks

Stored beam and injection

1400-1600

SR qualification console test

Sutton

Stored beam and injection

1600-2000

datapool correction with overlap compensation

Emery

Lenkszus

Shang

Stored beam and injection

2000-2400

Multibunch instability study

Harkay

Stored beam and injection

2400

Beginning of shutdown

OPS

No beam

 

End of Studies