Machine Studies

Schedule for Run1-5,2002

02/18, 0800 to 02/20,16000

Time

Descriptions

Studiers

SRStatus

 

Monday, 02/18/02

 

 

0800-1600

Troubleshooting L2 communication

Pasky

Stored beam, no injection

0800-1200

CPU AC mode tuning

Vasserman

Emery

Sereno

Stored beam, no injection

0800-1000

Access to PAR to investigate PAR RF cavity

Smith

Stored beam, no injection

1000-1200

Thermal imaging of PAR septum capacitor banks.

PS group

Stored beam, no injection

1200-1600

Continue verifying SR corrector `feed-forward' checkout in zone B and C (no tunnel access)

Carwardine

Hillman

no beam

1200-1400

Control access to Zone-A to replace dosemeter on 3ID devices, HP and PFS support required

Petra

no beam

1200-1600

Fix SR corrector reservoir capacitor crimp connections in zone B (no tunnel access)

PS group

no beam

1200-1600

Fix noisy readbacks in S18B:H4

PS group

no beam

1200-1600

Inspect/checkout of S:IK2 kicker power supply for problems that may have caused the lost setpoint

Carwardine

no beam

1200-1600

SR RF work and switch to RF1/RF2

Horan

RF group

no beam

1530-1600

Establish stored beam

OPS

Stored beam, no injection

1600-2200

BPM work - cogging tests

Decker

Singh

Stored beam, no injection

1600-2200

RF gun studies

Borland

Stored beam, no injection

2200-2400

Impedance measurement of small gap ID chamber

Chae

Emery

Stored beam and injection

 

Tuesday, 02/19/02

 

 

0000-0200

Impedance measurement of small gap ID chamber

Chae

Emery

Stored beam and injection

0200-0400

SR training

Rivera

OPS

Stored beam and injection

0400-0600

Chromaticity for high single bunch current low emittance lattice

Harkay

Stored beam and injection

0600-0800

Study the effect on the beam stability of damping the 60 Hz and 360 Hz AM on the rf voltage with RF1/RF2, switch back to RF2/RF4 after the study

Harkay

Horan

Stored beam and injection

0800-1000

Booster/SR training

Shultes

OPS

Stored beam and injection

1000-1600

ID Xbpm calibration

Erwin

Hahne

Singh

Stored beam and injection

1000-1300

Operator qualification test on linac, injection to SR may be needed.

Hill

Pasky

Stored beam and injection

1300-1800

Test new booster by-pass BPM timing system, injection to SR may be needed during the first 3 hours.

Lewellen

Stored beam, no injection

1800-2400

Operations simulation of data pool orbit correction

Emery

Shang

Stored beam and injection

1800-2400

remeasure beta function for 35BM source point

Emery

Stored beam and injection

1800-2400

Booster injection controllaw study

Sereno

Stored beam and injection

 

Wednesday, 02/20/02

 

 

0000-0200

Booster injection controllaw study

Sereno

Stored beam and injection

0200-0600

Single bunch instability imaging with S35 cameras

Harkay

Yang

 

 

Stored beam and injection

0600-0800

Ready for user beam with Top-Up, low emittance and singlet bunch pattern

OPS

Yao

Stored beam and injection

 

End of Studies