Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 03/18/02
|
|
|
0800-1200
|
Corrector feedforward signal checkout in Zone-E and F.
|
McNamara
PS group
|
No beam
|
0800-1000
|
reboot all the ID and Front End IOCs
|
Mohan
|
No beam
|
0800-0930
|
Replace RF2 and RF4 Orphan load with new units
|
Horan
Swetin
|
No beam
|
0830-1000
|
Operators Booster console test
|
Banks
Shultes
|
Booster beam
|
0800-1000
|
Access Zone-A to add dosimeter to S3 and 4 ID devices, control access with multipole magnet supplies on.
|
Petra
|
No beam
|
1000-1200
|
Measure the booster circumference
|
Sereno
|
Booster beam
|
1200-1600
|
High current study with 130mA stored beam and doublet fill pattern
|
Singh
Emery
Yang
Cherbak
|
Stored beam and injection
|
1600-2000
|
Lower emittance lattice setup
|
Emery
|
Stored beam and injection
|
2000-2400
|
Longitudinal injection lattice correction
|
Emery
Sajaev
|
Stored beam and injection
|
|
Tuesday, 03/19/02
|
|
|
0000-0600
|
BPM cogging test
|
Decker
|
Stored beam and injection
|
0600-0800
|
Shielding verification for 16ID
|
Mohan
|
Stored beam, and injection
|
0600-0800
|
Check linac/par MPEOB interlock
|
Carwardine
PS group
|
Stored beam, no injection
|
0800-1200
|
3/20 terms polynomials and data pool tests
|
Lenkszus
Singh
|
Stored beam and injection
|
0800-1200
|
Linac ioc based controllaw test (parasitic)
|
Borland
|
Stored beam and injection
|
1200-1600
|
High current with 130mA, need to fix S23A:S2 first.
|
Singh
Harkay
Yao
Horan
Cherbak
|
Stored beam and injection
|
1600-2000
|
Single bunch current limit study
|
Harkay
|
Stored beam and injection
|
2000-2400
|
AC mode CPU study
|
Emery
Vasserman
|
Stored beam and injection
|
|
Wednesday, 03/20/02
|
|
|
0000-0400
|
Imaging Injection Process: Low-Emittance User Lattice vs. Longitudinal Injection Lattice
|
Chae
Emery
Yang
|
Stored beam and injection
|
0400-0700
|
Investigate local bump steering instability with 0.5 second interval
|
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for user beam with low emittance lattice and top-up
|
Ops
Yao
|
Stored beam, and injection
|
|
End of Studies
|
|
|