Machine Studies

Schedule for Run2-10,2002

July 30th, 0800 - July 30th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 07/30/00

 

 

0000-0400

Beam Energy Calibration. Requries SR pinger hooked-up in CW mode.

Chae

Stored beam and injection

0400-0800

SR orbit correction sddscontrollaw running in an ioc.

Emery
Lenkszus
Shang
Soliday

Stored beam and injection

0600-0800

Hook-up SR pinger in pulsed mode.

J. Wang

Stored beam and injection

0600-0800

Linac work (unspecified).

Pasky

Stored beam and no injection

0700-0800

BTS magnet software.

Borland

Stored beam and no injection

0800-1200

Lower emittance lattice optics correction and characterization

Emery

Stored beam and injection

1200-1500

Lower emittance lattice light source point steering.

Emery
Singh

Stored beam and some injection

1200-1350

Filter wiring on PTB:B1 and PTB:B2 DSP cards.

Fors

Stored beam and no injection

1200-1300

Booster ACIS panel access.

ASD-CTL
ASD-ES

Stored beam and no injection

1200-1300

Booster power monitor work.

RF group

Stored beam and no injection

1500-1600

Prepare for top-up low-emittance operations

OPS

Stored beam and injection