Schedule for Run2-11,2002

August 5th, 0800 - August 7th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 08/05/02

 

 

0800-1200

Conversion of PAR harmonic rf system. Need linac beam

RF group

No beam

0800-1200

Zones C and D access for installing P0 electronics to bpms S23B:P0 S24A:P0 S24B:P0.

Erwin

No beam

0800-1200

Modify and test 2 sectors of correctors (in Zone B) with DAC chip that replaces PSCU/Diag setpoint modes.

Fors

No beam

0800

Configure IK5 in CW mode.

ES group

No beam

0830-1000

Zones F access for replacing blowers of S39IK2 kicker.

Morrison

No beam

0900-1000

Zone A access for alanine film replacement in ID3.

Petra

No beam

0930-1100

Booster access for measurement or bridge area

ME group

No beam

0800-1000

Change the line driver for the Booster rf power monitor.

Nassiri

No beam

0800-1000

Replace the DSP card in PTB:B1 and complete anti-alias filter modifications to PTB:B2

Donkers

No beam

0800-1000

Test response to power failure on Sectors 22 and 16 EPS systems. (Note MPS may trip)

Behrndt

No Beam

0800-1600

Installation of the S35 Timing System. Note S:VID will be down for 2 hours.

Yang

Some beam

1200-1600

Data pool SR orbit correction

Lenkszus
Soliday
Shang
Emery

Stored beam and injection

1600-2000

Orbit motion study with punched down correctors.

Carwardine
Emery or Yao

Stored beam and injection

2000-2400

Investigate bunch purity in the SR due to number of linac bunches selected and 12th harmonic power or phase.
Need IK5 in CW mode.

Lumpkin
Yao

Stored beam and injection

 

Tuesday, 08/06/02

 

 

0000-0200

SR training

Hill

Stored beam and occasional injection

0200-0700

ID Xbpm gap vs gain measurements

Hahne

Stored beam and occasional injection

0200-0800

Commissioning booster low emittance lattices.

Sereno

Stored beam and injection

0700-0800

Reconfigure and test raw PS T1 in a double sector operating at lower voltage

ES group

Stored beam and injection

0800

Reconfigure IK5 in pulsed mode.

ES group

Stored beam and injection

0800-1000

Replacement of flow control cartridges for linac.

Dortwegt

Stored beam and no injection

0800-1000

Upgrade CPU in ioclid2.

Arnold

Stored beam and no injection

0800-1000

Change the operating linac gun from RG1 to RG2.

Pasky

Stored beam and no injection

0800-1000

Test new rfgun cathode power supply.

Pasky

Stored beam and no injection

0800-1000

Measure rms motion with lower corrector raw voltage. Note no injection.

Carwardine
Emery

Stored beam and no injection

1000-1300

Lower emittance lattice optics correction and steering.

Emery
Sajaev

Stored beam and injection

1300-1700

Data pool correction

Lenkszus
Soliday
Shang
Emery

Stored beam and injection

1700-2000

CPU AC mode correction at more points.

Vasserman

Emery

Stored beam and injection

2000-2300

BPM history data collection. Need IK5 in pulsed mode.

Wang

Stored beam and injection

2300-0000

SR training

Hill

Stored beam and

occasional injection

 

Wednesday, 08/07/02

 

 

0000-0100

SR training (cont'd)

Hill

Stored beam and

occasional injection

0100-0400

NbBpm tests

Singh
Erwin

Stored beam and injection

0400-0600

Run top-up with low emittance booster lattice.

Sereno

Stored beam and injection

0400-0600

ID gap feedforward. Parasitic to top-up test.

Singh

Stored beam and injection

0600-0700

Re-install the original corrector DAC chips in 2 sectors

Fors

No beam

0700-0800

Setup for User low-emittance topup.

OPS