Machine Studies

Schedule for Run2-12,2002

August 13th, 0000 - August 13th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 07/30/00

 

 

0000-0200

Test short history with pinger in CW mode.

C. Wang

Stored beam and injection

0200-0600

Further optimization of lower emittance lattice. Recover low emittance before end.

Emery
Sajaev

Stored beam and injection

0600-0630

Replace the iochdg1 cpu

Arnold

Stored beam and no injection

0600-0700

Test SR corrector FORS-2 chip for bumpless reboot of IOC and PSCU with beam. No beam for first 30 minutes for installation. Uninstall at 1200h.

Fors

Stored beam and injection

0700

Fill SR to 102 mA, low emittance.

OPS

Stored beam and injection

0700-1000

PAR RF function generator setup.

Dimonte
T. Smith

Stored beam and no injection

0700-1000

ID xbpm gain vs gap measurements. Note injector not available.

Hahne
Roberts

Stored beam and no injection

0700-830

Investigate booster power monitor anomalous trip.

Grelick

Stored beam and no injection

0830-1000

Correct booster low emittanace ramp tables.

Sereno

Stored beam and no injection

1000-1300

Optimize PAR RF function generator settings.

Borland
Sereno

Stored beam and injection

1000-1200

Further tests of sddscontrollaw in ioc.

Lenkszus
Soliday

Stored beam and injection

1200-1300

Hook up a power monitor on TPP-R3. This will take down the booster correctors and HET power supplies.

ES group

No stored beam and no injection

1200-1300

Uninstall FORS-2 chip.

Fors

No stored beam and no injection

1200-1300

Move test equipment on 10-ID front-end EPS.

Behrndt

No stored beam and no injection

1300-1500

Vector mode orbit correction script testing.

Shang
Emery

Stored beam and injection

1300-1500

Further CPU correction optimization. Parasitic to above.

Vasserman

Stored beam and injection

1500-1600

Prepare for top-up low-emittance operations

OPS

Stored beam and injection