Schedule for Run2-14, 2002

August 27th, 0000 - August 27th 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 08/27/00

 

 

0000-0030

Collect xbpm data at 15 mm gap

Singh

Stored beam and injection

0030-0500

Restore steering for high-emittance lattice, and triplet hybrid bunch pattern.

Singh

Stored beam and injection

0500-0700

Datapool script tests. (Use high-emittance lattice)

Emery
Shang
Lenkszus

Stored beam and injection

0700-0930

Fix for corrector range errors with FORS-2 chip.

Instrument and condition the SR dipole supply to troubleshoot the recurring ground fault trips

Investigate S13BV3 readback problem

Replace the top-up key switch.

 

Fors

McNamara

Hillman

Forrestal

No beam

0700-0900

Research/verify schematics/wiring diagrams for the Booster MPEOB system

Markovich

No beam

0900-0930

Get booster ready.

OPS

No beam

0930-1100

Datapool script tests. (cont'd)

Emery
Shang
Lenkszus

Stored beam and injection

1100-1300

ID xbpm Feedforward. (Use high-emittance lattice)

Decker
Singh

Stored beam and injection

1300-1500

SR operator qualification. (Use high-emittance lattice)

Shultes

Stored beam and injection

1500-1600

Prepare for non-topup high-emittance operations with triplet hybrid bunch pattern.

OPS

Stored beam and injection