Machine Studies

Schedule for Run2-15,2002

September 4th, 0000 - September 4th 2400

 

Time

Descriptions

Studiers

SRStatus

 

Wednesday, 09/04/02

 

 

0000-0030

Collect xbpm data at 15 mm

Hahne
Erwin

Stored beam and injection

0030-0500

AlignID xbpms at 15 mm

Hahne
Erwin
Roberts

Stored beam and injection

0500-0700

SR operator qualification test

Shultes

Stored beam and injection

0700

Inject 100 mA in SR (high emittance)

OPS

Stored beam and injection

0700-0900

Thermal imaging of booster dipole PS. Injection into SR not available.

Markovich/McNamara

Stored beam and no injection

0700-1000

ID Xbpm feedforward

Decker
Singh

Stored beam and partly no injection

1000-1300

Tests nbbpms

Singh

Stored beam and injection

1300-1400

Test the nBPM/DBPLD system with the P1 buttons at ID21

Pietryla

Stored beam and injection

1400-1700

Datapool test of start/stop and steering

Shang
Emery

Stored beam and injection

1700-2000

Response matrix measurement with different currents (low-emittance)

Sajaev

Stored beam and injection

2000-2400

Signal/noise study of bpm history. (low-emittance and IK5 run in CW mode.)

C. Wang

Stored beam and injection