Machine Studies

Schedule for Run2-2,2002

June 4th, 0000 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 06/04/00

 

 

0000-0300

Collect xbpm data at 15 mm gap. (high emittance lattice)

Singh

Stored beam and injection

0300-0330

Setup SR for low-emittance

Borland

Stored beam and injection

0330-1030

Restore orbit and check top-up.

Singh
Borland

Stored beam and injection

0800-1000

PAR console test. Provide beam to SR if SR beam is dumped.

OPS

Beam and no injection

0800-1500

Commission 3rd XBPM stage controller system.

Erwin

Beam and some injection

0800-1000

 

replace the wiring to the anti-alias filters on the interleaving DSP cards (parasitic)

Fors

Stored beam and injection

1030-1100

RF waveguide switch

RF

No beam

1100-1500

Replace MSI card on S35 (parasitic)

Pietryla

Stored beam and injection

1100-1500

SR energy calibration by resonant de-polarization. (low emittance lattice)

Chae

Stored beam and injection

1500-1600

Recover for User beam and top-up

OPS

Stored beam and injection