Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 06/18/00
|
|
|
0800-1400
|
RF5 fuse disconnect.
|
Trento
Bromberek
|
Stored beam for some time
|
0800-0900
|
PAR operator re-qualification
|
OPS
|
Stored beam and no injection
|
0900-1000
|
Test ID mode switching software
|
Borland
|
Stored beam and no injection
|
0800-0900
|
Measure neutron signal during RF gap voltage ramp
|
Emery
Job
|
Stored beam
|
0900-1000
|
Test sddscontrollaw change
|
Emery
|
Stored beam and no injection
|
0900-1000
|
Switch to RG1
|
Borland
|
Stored beam and no injection
|
1000-1100
|
iocsrmon upgrade
|
Dimonte
|
No beam
|
1000-1200
|
IS1 DAC ramp rate.
|
J. Wang
|
No beam
|
1000-1200
|
Gespac problem investigation in sector 9. (need to operate Zone A)
|
ESG
|
No beam
|
1000-1200
|
Motor problem in ID9. (Zone B access)
|
Grimmer
|
No beam
|
1000-1200
|
15BM EPS work
|
ESG
|
No beam
|
1000-1200
|
ACIS BTS double beam stop controller
|
Hogrefe
|
No beam
|
1000-1100
|
VME bus analyzer on iocs23fb.
|
Lenkszus
|
No beam
|
1100-1200
|
Test corrector restore.
|
Lenkszus
|
No beam
|
1400
|
Inject into Storage ring. Check injection software.
|
OPS
|
Stored beam and injection
|
1400-1500
|
Check 130 mA injection for storage ring. (Preparation for June 24th run.)
|
Yao
Singh
Harkay
|
Stored beam and injection
|
1500-1600
|
Fine adjustments of EMW correction.
|
Emery
|
Stored beam and injection
|
1500-1600
|
Recover for User beam and top-up
|
OPS
|
Stored beam and injection
|