Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 06/24/02
|
|
|
0800-1000
|
Continue deliver beam. Acquire baseline data at 100mA, singlet with top-up
|
Yao
Horan
Harkay
|
Stored beam and injection
|
1000-1200
|
Fill to 115 mA and top-up
|
Yao
Horan
Harkay
|
Stored beam and injection
|
1200-1600
|
Fill to 130 mA and top-up
|
Yao
Horan
Harkay
|
Stored beam and injection
|
1600-1800
|
Booster training
|
Hill
Banks
|
Stored beam and injection
|
1600-2000
|
CPU studies
|
Vasserman
Emery
|
Stored beam and injection
|
2000-2400
|
Low emittance lattice correction
|
Sajaev
|
Stored beam, injection possible
|
1800-2400
|
Low emittance booster setup with occasional injection
|
Sereno
|
Stored beam, injection possible
|
|
Tuesday, 06/25/02
|
|
|
0000-0200
|
Low emittance lattice correction
|
Sajaev
|
Stored beam and occasional injection
|
0000-0800
|
Linac waveguide rf conditioning. Occasional injection.
|
OPS
Pasky
|
Stored beam and occasional injection
|
0000-0400
|
SR lifetime study
|
Emery
|
Stored beam and occasional injection
|
0500-0700
|
LTP:B1 interleaving PS DSP maintenance
|
Fors
|
No beam
|
0700-0800
|
Replace fiber optical links from selene to disk arrays
|
Stejskal
ISS group
|
No beam
|
0800-1100
|
Control access to zone A to replace docimeter on 3ID (notify)
|
Grimmer
|
No beam
|
0700-0900
|
S9BH2 converter
|
Hillman
|
No beam
|
0700-0900
|
S27BV4 Dac readback problem investigation
|
Hillman
Fors
|
No beam
|
0700-0800
|
Investigate S24B:Q5 DAC
|
Fors
|
No beam
|
0700-0900
|
Remove shorting plate SR WG RF1. All SR rf is down.
|
Nassiri
|
No beam
|
0700-0900
|
Correct HET double stop problem. Possible ACIS trips during tests. No parasitic beam studies for booster or SR.
|
Hogrefe
|
No beam
|
0700-0900
|
Remove 15BM EPS rack power
|
Friedman
|
No beam
|
0900-1000
|
Install monitoring equipment on the booster transductor electronics power supplies
|
Hillman
Maclean
|
No beam
|
1000-1200
|
IS1 Dac ramping rate test
|
J.Wang
Maclean
|
No beam
|
0700-1200
|
Commission VXI function generator for PAR. No parasitic studies. Need linac beam.
|
Dimonte
T. Smith
|
Stored beam and no injection
|
1200-1800
|
Xbpm orbit feedback
|
Decker
Singh
|
Stored beam and occasional injection
|
1200-1800
|
Linac modulator/timing study, occasional injection
|
Nassiri
Grelick
Cours
|
Stored beam and occasional injection
|
1800-2000
|
Booster training
|
Hill
Banks
|
Stored beam and injection
|
2000-2400
|
BTS collimator studies
|
Emery
|
Stored beam and injection
|
|
Wednesday, 06/26/02
|
|
|
0000-0500
|
Continue BPM history study
|
C. Wang
|
Stored beam and injection
|
0500-0700
|
Test and Commission nbbpms. Occasional injection
|
Singh
Erwin
|
Stored beam and occasional injection
|
0700-0800
|
Recover for User beam, low emittance, singlet and top-up
|
OPS
|
Stored beam and injection
|