Machine Studies

Schedule for Run2-5,2002

June 24th, 0800 - June 26th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 06/24/02

 

 

0800-1000

Continue deliver beam. Acquire baseline data at 100mA, singlet with top-up

Yao

Horan

Harkay

Stored beam and injection

1000-1200

Fill to 115 mA and top-up

Yao

Horan

Harkay

Stored beam and injection

1200-1600

Fill to 130 mA and top-up

Yao

Horan

Harkay

Stored beam and injection

1600-1800

Booster training

Hill

Banks

Stored beam and injection

1600-2000

CPU studies

Vasserman
Emery

Stored beam and injection

2000-2400

Low emittance lattice correction

Sajaev

Stored beam, injection possible

1800-2400

Low emittance booster setup with occasional injection

Sereno

Stored beam, injection possible

 

Tuesday, 06/25/02

 

 

0000-0200

Low emittance lattice correction

Sajaev

Stored beam and occasional injection

0000-0800

Linac waveguide rf conditioning. Occasional injection.

OPS

Pasky

Stored beam and occasional injection

0000-0400

SR lifetime study

Emery

Stored beam and occasional injection

0500-0700

LTP:B1 interleaving PS DSP maintenance

Fors

No beam

0700-0800

Replace fiber optical links from selene to disk arrays

Stejskal

ISS group

No beam

0800-1100

Control access to zone A to replace docimeter on 3ID (notify)

Grimmer

No beam

0700-0900

S9BH2 converter

Hillman

No beam

0700-0900

S27BV4 Dac readback problem investigation

Hillman

Fors

No beam

0700-0800

Investigate S24B:Q5 DAC

Fors

No beam

0700-0900

Remove shorting plate SR WG RF1. All SR rf is down.

Nassiri

No beam

0700-0900

Correct HET double stop problem. Possible ACIS trips during tests. No parasitic beam studies for booster or SR.

Hogrefe

No beam

0700-0900

 

Remove 15BM EPS rack power

Friedman

No beam

0900-1000

Install monitoring equipment on the booster transductor electronics power supplies

Hillman

Maclean

No beam

1000-1200

 

IS1 Dac ramping rate test

J.Wang

Maclean

No beam

0700-1200

Commission VXI function generator for PAR. No parasitic studies. Need linac beam.

Dimonte
T. Smith

Stored beam and no injection

1200-1800

Xbpm orbit feedback

Decker

Singh

Stored beam and occasional injection

1200-1800

Linac modulator/timing study, occasional injection

Nassiri

Grelick

Cours

Stored beam and occasional injection

1800-2000

Booster training

Hill

Banks

Stored beam and injection

2000-2400

BTS collimator studies

Emery

Stored beam and injection

 

Wednesday, 06/26/02

 

 

0000-0500

Continue BPM history study

C. Wang

Stored beam and injection

0500-0700

Test and Commission nbbpms. Occasional injection

Singh
Erwin

Stored beam and occasional injection

0700-0800

Recover for User beam, low emittance, singlet and top-up

OPS

Stored beam and injection