Machine Studies

Schedule for Run2-6,2002

July 4th, 0800 - July5th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Thursday, 07/04/00

 

 

0800-1100

Reconfigure RF1 waveguide

RF group

No beam

0800-0900

Power monitor chassis for the Booster

RF group

No beam

1100-1500

Investigate instability with high gap voltage and high current using bpms, streak camera, digitizer and HOM on VSA.

Emery
Decker
RF group
Yang
Harkay

Stored beam and injection

1500-1900

35-ID dispersion studies

Yang

Stored beam and injection

1900-2300

Open for BPM offset measurements

OPS

Stored beam and injection

2300-2400

Measure beta functions in ID3 ID4 using quad scans and ...

Emery

Stored beam and injection

 

Friday, 07/05/00

 

 

0000-0200

Measure response matrix of corrected low-emittance lattice

Emery

Stored beam and injection

0100-0300

Booster training (overlap with previous studies)

Hill

Stored beam and injection

0300-0700

Measure single bunch characteristics with corrected low-emittance lattice

Harkay

Stored beam and injection

0700-0800

Prepare for top-up operations

OPS

Stored beam and injection