Machine Studies

Schedule for Run2-7,2002

July 8th, 0800 - July 10th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 07/08/02

 

 

0810-1200

Test, calibrate, and maybe install the VXI version of Arbitrary Waveform Synthesizer in PAR. Need linac beam.

Dimonte
Smith

No beam and no injection

0800-0830

Collect xray BPM data with gaps closed at 15 mm.

Singh

SR beam and no injection

0800-0810

Linac down for switching test stand cathode heater power supply.

Lewellen

No beam and no injection

0830-1030

Mid-run SR walk-through for water leak check (Note that Zones B and C must be in controlled access by 1000h for PS testing).

ME group

No beam

0830-1100

Zone F access for cavity blower replacement and 35-BM pinhole camera slit adjustment

RF group
Yang

No beam

0930-1000

Zone E access for bad rotary encoder on ID34.

Grimmer

No beam

0930-1000

Zone A access for alanine film swap in ID3.

Petra

No beam

0800-0900

Change 12 love controllers

Putnam

No beam and no injection

0800-0830

Remove jumpers for HET stop

Forrestal

No beam and no injection

0800-1000

Remove old ribbon cables from S9 cabinet 5

ESG

No beam and no injection

0800-1000

Booster corrector raw supply BRH420 work.

ESG

No beam and no injection

1000-1200

Check S20BMT and S15BMTconverter. (SR Zones B and C must be in controlled access by this time)

ESG

No beam and no injection

1200-1210

Linac down for switching test stand cathode heater power supply.

Lewellen

No beam and no injection

1210-1400

Booster training

Hill

Stored beam and

occasional injection

1210-1600

CPU AC mode correction at more points.

Vasserman

Emery

Stored beam and injection

1400-1600

Test new sddsglitchlogger

Soliday
Borland

Stored beam and injection

1400-1600

Test new logDaemon

Shang
Borland
Sidorowizc

Stored beam and injection

1400-1600

Linac access to install a preamp in the tunnel for the L3 30 GHz coherent transition radiation detector, switch test stand cathode heater power supply, and for some unspecified thing RF group wants to do.

Decker
Lewellen
Nassiri

Stored beam and no injection

1600-2000

Single bunch instability studies

Harkay

Stored beam and injection

2000-2400

SR Bunch purity studies as a function of the linac pulse train + bunch cleaning

Lumpkin
Yao

Stored beam and injection

 

Tuesday, 07/09/02

 

 

0000-0200

Chromaticity correction script check with low-emittance lattice

Sajaev

Stored beam and injection

0200-0400

Response measurement of high-emittance lattice.

Sajaev

Stored beam and injection

0400-0600

Lifetime vs chromaticity of high-emittance lattice.

Sajaev
Emery

Stored beam and injection

0600-1200

Orbit for high emittance lattice

Singh
Emery

Stored beam and injection

1000-1200

Booster training

Hill

Stored beam and

occasional injection

1200-1400

Waveguide reconfiguration

RF group

No beam

1200-1400

Check L1:RG1:LFA:TRM BOSS supply. No linac beam possible.

ESG

No beam

1200-1400

Replace S20BMT cable

Donkers

No beam

1400-1800

Beam Energy Calibration

Chae

Stored beam and injection

1800-2100

Multi-bunch instability studies

Harkay

Stored beam and injection

1900

Louis Emery goes on vacation for 10 days.

Emery

SR can still run.

2100-2400

BPM history data collection

Wang

Stored beam and injection

 

Wednesday, 07/10/02

 

 

0000-0100

BPM history data collection (cont'd)

Wang

Stored beam and injection

0100-0700

ID xbpm feedforward

Decker

Stored beam and injection

0700-0800

Setup for User beam high-emittance, non-topup.

OPS

Stored beam and injection