Monday, 07/08/02
|
|
|
0810-1200
|
Test, calibrate, and maybe install the VXI version of Arbitrary Waveform Synthesizer in PAR. Need linac beam.
|
Dimonte
Smith
|
No beam and no injection
|
0800-0830
|
Collect xray BPM data with gaps closed at 15 mm.
|
Singh
|
SR beam and no injection
|
0800-0810
|
Linac down for switching test stand cathode heater power supply.
|
Lewellen
|
No beam and no injection
|
0830-1030
|
Mid-run SR walk-through for water leak check (Note that Zones B and C must be in controlled access by 1000h for PS testing).
|
ME group
|
No beam
|
0830-1100
|
Zone F access for cavity blower replacement and 35-BM pinhole camera slit adjustment
|
RF group
Yang
|
No beam
|
0930-1000
|
Zone E access for bad rotary encoder on ID34.
|
Grimmer
|
No beam
|
0930-1000
|
Zone A access for alanine film swap in ID3.
|
Petra
|
No beam
|
0800-0900
|
Change 12 love controllers
|
Putnam
|
No beam and no injection
|
0800-0830
|
Remove jumpers for HET stop
|
Forrestal
|
No beam and no injection
|
0800-1000
|
Remove old ribbon cables from S9 cabinet 5
|
ESG
|
No beam and no injection
|
0800-1000
|
Booster corrector raw supply BRH420 work.
|
ESG
|
No beam and no injection
|
1000-1200
|
Check S20BMT and S15BMTconverter. (SR Zones B and C must be in controlled access by this time)
|
ESG
|
No beam and no injection
|
1200-1210
|
Linac down for switching test stand cathode heater power supply.
|
Lewellen
|
No beam and no injection
|
1210-1400
|
Booster training
|
Hill
|
Stored beam and
occasional injection
|
1210-1600
|
CPU AC mode correction at more points.
|
Vasserman
Emery
|
Stored beam and injection
|
1400-1600
|
Test new sddsglitchlogger
|
Soliday
Borland
|
Stored beam and injection
|
1400-1600
|
Test new logDaemon
|
Shang
Borland
Sidorowizc
|
Stored beam and injection
|
1400-1600
|
Linac access to install a preamp in the tunnel for the L3 30 GHz coherent transition radiation detector, switch test stand cathode heater power supply, and for some unspecified thing RF group wants to do.
|
Decker
Lewellen
Nassiri
|
Stored beam and no injection
|
1600-2000
|
Single bunch instability studies
|
Harkay
|
Stored beam and injection
|
2000-2400
|
SR Bunch purity studies as a function of the linac pulse train + bunch cleaning
|
Lumpkin
Yao
|
Stored beam and injection
|
|
Tuesday, 07/09/02
|
|
|
0000-0200
|
Chromaticity correction script check with low-emittance lattice
|
Sajaev
|
Stored beam and injection
|
0200-0400
|
Response measurement of high-emittance lattice.
|
Sajaev
|
Stored beam and injection
|
0400-0600
|
Lifetime vs chromaticity of high-emittance lattice.
|
Sajaev
Emery
|
Stored beam and injection
|
0600-1200
|
Orbit for high emittance lattice
|
Singh
Emery
|
Stored beam and injection
|
1000-1200
|
Booster training
|
Hill
|
Stored beam and
occasional injection
|
1200-1400
|
Waveguide reconfiguration
|
RF group
|
No beam
|
1200-1400
|
Check L1:RG1:LFA:TRM BOSS supply. No linac beam possible.
|
ESG
|
No beam
|
1200-1400
|
Replace S20BMT cable
|
Donkers
|
No beam
|
1400-1800
|
Beam Energy Calibration
|
Chae
|
Stored beam and injection
|
1800-2100
|
Multi-bunch instability studies
|
Harkay
|
Stored beam and injection
|
1900
|
Louis Emery goes on vacation for 10 days.
|
Emery
|
SR can still run.
|
2100-2400
|
BPM history data collection
|
Wang
|
Stored beam and injection
|
|
Wednesday, 07/10/02
|
|
|
0000-0100
|
BPM history data collection (cont'd)
|
Wang
|
Stored beam and injection
|
0100-0700
|
ID xbpm feedforward
|
Decker
|
Stored beam and injection
|
0700-0800
|
Setup for User beam high-emittance, non-topup.
|
OPS
|
Stored beam and injection
|