Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 07/22/02
|
|
|
0800-1000
|
Prepare for VIP visit
|
OPS
Borland
|
Store beam and injection
|
1000-1200
|
Demo
|
OPS
Borland
|
Store beam and injection
|
1200-1800
|
Refining the S-band switching modes. Linac RF measurement timing vs switching to alternate mode. May need to provide injection if stored beam is lost.
|
Pasky
Grelick
|
Store beam and injection
|
1600-2000
|
Test/install VXI waveform synthesizer for the PAR RF
|
Dimonte
|
Store beam and injection
|
1600-1700
|
ID Gap feedforward script modification, does not require stored beam
|
Borland
|
Store beam and injection
|
1700-2200
|
ID feedforward
|
Decker
Singh
Borland
|
Store beam and injection
|
1700-1900
|
Work on the PAR DC bump and orbit.
|
Borland
|
Store beam and injection
|
2200-2400
|
Cogging tests
|
Singh
Decker
|
Store beam and injection
|
|
Tuesday, 07/23/02
|
|
|
0000-0300
|
Response matrix measurement with BPM gains
|
Sarajev
|
Store beam and injection
|
0300-0700
|
Response matrix measurement for the lower emittance lattice
|
Sarajev
Emery
|
Store beam and injection
|
0700-0900
|
Zone-F access to adjust 35 BM pinhole slits.
|
Yang
|
No beam
|
0700-0900
|
Access zone-B and A to repair ID9 and ID3
|
Grimmer
|
No beam
|
0700-0900
|
Access zone-F to install BPMs
|
Erwin
Diag group
|
No beam
|
0700-0900
|
Check dipole supply hose and connection
|
McNamara
PS group
|
No beam
|
0900-1000
|
Inspect SR BM supply opto isolator board
|
McNamara
PS group
|
No beam
|
0700-1000
|
Install a waveguide piece at RF1. All 420 RF system will be shutdown
|
Nassiri
RF group
|
No beam
|
0700-0830
|
Remove power monitoring equipment from 15BM FE EPS. Will drop PSS/ACIS
|
Friedman
|
No beam
|
0830-0930
|
Check the wiring of FE EPS interface toe the BL EPS at 10ID
|
Friedman
|
No beam
|
0900-1100
|
Install and test modified top-up code, need to run the IS1 septum supply
|
Lenkszus
|
No beam
|
0700-0800
|
Complete the test of RF gun test stand power supplies
|
Hillman
|
No beam
|
0700-0800
|
Reboot iocruncontrol
|
Lenkszus
|
No beam
|
1100-1115
|
Restore stored beam
|
OPS
|
Store beam and injection
|
1100-1500
|
Instability with RF phase perturbation
|
Yao
Horan
|
Store beam and injection
|
1500-1900
|
Narrow band BPM test
|
Erwin
Singh
|
Store beam and injection
|
1500-1900
|
Fast orbit correction test
|
Lenkszus
Shang
Emery
|
Store beam and injection
|
1900-2300
|
CPU AC mode tuning
|
Vasserman
Emery
|
Store beam and injection
|
2300-2400
|
Cerenkov detector signal with on-axis injection
|
Emery
Pietryla
|
Store beam and injection
|
|
Wednesday, 07/24/02
|
|
|
0000-0300
|
Cerenkov detector signal with on-axis injection
|
Emery
Pietryla
|
Store beam and injection
|
0300-0700
|
Energy calibration Frequency measurement
|
Chae
Sajaev
|
Store beam and injection
|
0700-0800
|
Ready for user beam with low emittance and top-up
|
Yao
OPS
|
Stored beam and injection
|
|
End of Studies
|
|
|