Machine Studies

Schedule for Run2-9,2002

July 22 0800-July 24 0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 07/22/02

 

 

0800-1000

Prepare for VIP visit

OPS

Borland

Store beam and injection

1000-1200

Demo

OPS

Borland

Store beam and injection

1200-1800

Refining the S-band switching modes. Linac RF measurement timing vs switching to alternate mode. May need to provide injection if stored beam is lost.

Pasky

Grelick

Store beam and injection

1600-2000

Test/install VXI waveform synthesizer for the PAR RF

Dimonte

Store beam and injection

1600-1700

ID Gap feedforward script modification, does not require stored beam

Borland

Store beam and injection

1700-2200

ID feedforward

Decker

Singh

Borland

Store beam and injection

 

1700-1900

Work on the PAR DC bump and orbit.

Borland

Store beam and injection

2200-2400

Cogging tests

Singh

Decker

Store beam and injection

 

Tuesday, 07/23/02

 

 

0000-0300

Response matrix measurement with BPM gains

Sarajev

 

Store beam and injection

0300-0700

 

Response matrix measurement for the lower emittance lattice

Sarajev

Emery

Store beam and injection

0700-0900

Zone-F access to adjust 35 BM pinhole slits.

Yang

No beam

0700-0900

Access zone-B and A to repair ID9 and ID3

Grimmer

No beam

0700-0900

Access zone-F to install BPMs

Erwin

Diag group

No beam

0700-0900

Check dipole supply hose and connection

McNamara

PS group

No beam

0900-1000

Inspect SR BM supply opto isolator board

McNamara

PS group

No beam

0700-1000

Install a waveguide piece at RF1. All 420 RF system will be shutdown

Nassiri

RF group

No beam

0700-0830

Remove power monitoring equipment from 15BM FE EPS. Will drop PSS/ACIS

Friedman

No beam

0830-0930

Check the wiring of FE EPS interface toe the BL EPS at 10ID

Friedman

No beam

0900-1100

Install and test modified top-up code, need to run the IS1 septum supply

Lenkszus

No beam

0700-0800

Complete the test of RF gun test stand power supplies

Hillman

No beam

0700-0800

Reboot iocruncontrol

Lenkszus

No beam

1100-1115

Restore stored beam

OPS

Store beam and injection

 

1100-1500

Instability with RF phase perturbation

Yao

Horan

 

Store beam and injection

 

1500-1900

Narrow band BPM test

Erwin

Singh

Store beam and injection

1500-1900

Fast orbit correction test

Lenkszus

Shang

Emery

Store beam and injection

1900-2300

CPU AC mode tuning

Vasserman

Emery

Store beam and injection

2300-2400

Cerenkov detector signal with on-axis injection

Emery

Pietryla

Store beam and injection

 

Wednesday, 07/24/02

 

 

0000-0300

Cerenkov detector signal with on-axis injection

Emery

Pietryla

Store beam and injection

0300-0700

Energy calibration Frequency measurement

Chae

Sajaev

Store beam and injection

0700-0800

Ready for user beam with low emittance and top-up

Yao

OPS

Stored beam and injection

 

End of Studies