Machine Studies

Schedule for Run3-10,2002

December 9, 0800 - December 11, 0800

Time

Descriptions

Studiers

SRStatus

 

Monday 12/09/02

 

 

0800-0830

Acquiring BPM reference data

Singh

Stored beam, no injection

0800-0900

Controlled access to the linac for laser alignment

Yuelin Li

Stored beam, no injection

0900-1100

BESOCM Trigger Select Chassis test

Arnold

Stored beam, no injection

0830-1200

CPU AC mode correction

Vasserman

Makarov

Emery

Stored beam, no injection

0900-1200

Linac access to pull in 2 new ACIS compliant waveguide switch control cables

Yonder

Grelick

Stored beam, no injection

0900-1000

Linac access to check CTR detector

Lumpkin

Gold

Stored beam, no injection

1200-1400

Remove the waveguide plate at RF1

Nassiri

No beam

1200-1400

Change BPLD board for 34ID

Pietryla

No beam

1200-1300

Test sector 39 storage ring scrapers without any beam

Stevens

No beam

1200-1300

Control access to replace dosimeter on 3ID, only LOTO MEPOB

Petra

No beam

1400-2200

Switch to high emittance lattice, BPLD validation for 34ID, restore beam orbit, and beam scrape down measurement

Singh

Emery

Stored beam and injection

1500-1700

Injector operator training (Occasional injection)

OPS

Banks

Stored beam and injection

2200-2400

Local impedance

Sajaev

Stored beam, and injection

 

Tuesday 12/10/02

 

 

0000-0400

Local impedance

Sajaev

Stored beam, and injection

0000-0200

Injector operator training (occasional injection)

OPS

Banks

Stored beam and injection

0400-0900

324-bunch operation preparation

Decker

Harkay

Sajaev

Stored beam and injection

0900-1100

324-bucket operation with users

Decker

User

Stored beam, and injection

1100-1300

Shielding verification for 16-ID-C

Salazar

Stored beam, and injection

1300-1700

Local impedance measurement

Emery

Stored beam and injection

1600-2400

Study adding a bump at the booster ES1 to reduce the required strength of B:EK

Sereno

Stored beam and injection

1700-2100

injection studies

Emery

Stored beam and injection

2100-2300

Investigate lower emittance with rf frequency shift. Emery Sajaev

 

Emery

Sajaev

Stored beam and injection

 

Wednesday 12/11/02

 

 

0000-0100

Investigate lower emittance with rf frequency shift. Emery Sajaev

 

Emery

Sajaev

Stored beam and injection

0100-0300

Chromaticity script test

Sajaev

Stored beam and injection

0300-0700

Single bunch limits in lower emittance lattice

Harkay

Stored beam and injection

0700-0800

Ready user beam with 1+22x1 fill pattern, high emittance and non-top-up

OPS

Yao

Stored beam, and injection

 

End of Studies