Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday 10/14/02
|
|
|
1600-1615
|
Collect xbpm data at 15mm gap with high emit. lattice
|
Singh
|
Stored beam and injection
|
1615-1700
|
Reboot ioclid2, iocparrf01, iocparrf02, iocbdg1, iocsrtune
|
Arnold
|
Stored beam and injection
|
1615-1700
|
Test reboot procedure for SR VP ioc
|
Maclean
|
Stored beam and injection
|
1615-2000
|
Switch to 2.9 nm-rad lattice, check top-up
|
Emery
|
Stored beam and injection
|
2000-2400
|
Orbit restore
|
Singh
|
Stored beam and injection
|
|
Tuesday 10/15/02
|
|
|
0000-0400
|
match BTS line/ injection
|
Emery
|
Stored beam and injection
|
0000-0400
|
Install power monitoring equipment at 7BM (parasitic study)
|
Behrndt
|
Stored beam and injection
|
0400-0700
|
BPLD test
|
Pietryla
Lenkszus
|
Stored beam and injection
|
0000-0700
|
SR operator training (parasitic or if time available)
|
Hill
OPS
|
Stored beam and injection
|
0700-0800
|
Ready for user beam with low emittance top-up
|
Yao
OPS
|
Study time available
|
|
End of Studies
|
|
|