Machine Studies

Schedule for Run3-2,2002

October 14 1600 - October 15 0800

Time

Descriptions

Studiers

SRStatus

 

Monday 10/14/02

 

 

1600-1615

Collect xbpm data at 15mm gap with high emit. lattice

Singh

Stored beam and injection

1615-1700

Reboot ioclid2, iocparrf01, iocparrf02, iocbdg1, iocsrtune

Arnold

Stored beam and injection

1615-1700

Test reboot procedure for SR VP ioc

Maclean

Stored beam and injection

1615-2000

Switch to 2.9 nm-rad lattice, check top-up

Emery

Stored beam and injection

2000-2400

Orbit restore

Singh

Stored beam and injection

 

Tuesday 10/15/02

 

 

0000-0400

match BTS line/ injection

Emery

Stored beam and injection

0000-0400

Install power monitoring equipment at 7BM (parasitic study)

Behrndt

Stored beam and injection

0400-0700

BPLD test

Pietryla

Lenkszus

Stored beam and injection

0000-0700

SR operator training (parasitic or if time available)

Hill

OPS

Stored beam and injection

0700-0800

Ready for user beam with low emittance top-up

Yao

OPS

Study time available

 

End of Studies