Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday 10/29/02
|
|
|
0800-0900
|
Investigate S19BH1 problem, no tunnel access
|
PS group
|
Injector beam only
|
0800-0900
|
Switch from RF2 to RF3
|
Smith
Horan
|
Injector beam only
|
0800-0900
|
Booster operator training
|
Jones
Schroeder
OPS
|
Injector beam only
|
0900-1100
|
Beam instability study, verify BPLD margin
|
Yao
|
Stored beam and injection
|
1100-1300
|
BTS trajectory reproduction after "goto dump", injection efficiency tune up
|
Emery
|
Stored beam and injection
|
1300-1530
|
data pool correction testing
|
Emery
Shang
Lenkszus
|
Stored beam and injection
|
1530-1600
|
Ready for user beam with low emittance top-up
|
Yao
OPS
|
Study time available
|
|
End of Studies
|
|
|