Machine Studies

Schedule for Run3-4,2002

October 29 0800 - 1600

Time

Descriptions

Studiers

SRStatus

 

Tuesday 10/29/02

 

 

0800-0900

Investigate S19BH1 problem, no tunnel access

PS group

Injector beam only

0800-0900

Switch from RF2 to RF3

Smith

Horan

Injector beam only

0800-0900

Booster operator training

Jones

Schroeder

OPS

Injector beam only

0900-1100

Beam instability study, verify BPLD margin

Yao

Stored beam and injection

1100-1300

BTS trajectory reproduction after "goto dump", injection efficiency tune up

Emery

Stored beam and injection

1300-1530

data pool correction testing

Emery

Shang

Lenkszus

Stored beam and injection

1530-1600

Ready for user beam with low emittance top-up

Yao

OPS

Study time available

 

End of Studies