Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday 11/04/02
|
|
|
0800-1200
|
CPU AC mode tuning
|
Vasserman
Emery
|
Stored beam, no injection
|
0800-1000
|
Investigate remote DSP reboot problems with LTP:B1 interleaving supply, requires control power to the supply
|
Fors
|
Stored beam, no injection
|
0800-1200
|
Modify Booster ES1 circuit
|
J. Wang
|
Stored beam, no injection
|
0800-1200
|
Modify Booster QF supply gain circuit
|
J. Wang
|
Stored beam, no injection
|
0800-1200
|
Access to linac tunnel to inspect and make any repairs to the RG2 kicker box
|
J. Wang
Pasky
|
Stored beam, no injection
|
0800-1400
|
Linac access for laser optics and camera alignment.
|
Lewellen
|
Stored beam, no injection
|
0800-1000
|
Checkthe bolts on the L4 and L5 linac accelerating structures
|
Friedsam
|
Stored beam, no injection
|
1200-1400
|
Restore network communication for 3 Storage Ring Vacuum Chamber Cooling
|
Swetin
|
Stored beam, no injection
|
1200-1400
|
Replace RF loads
|
Horan
RF group
ME group
|
No beam
|
1200-1300
|
Investigate raw supply trip
|
Markovich
|
No beam
|
1200-1300
|
Investigate S1B:H1 glitches
|
Donkers
|
No beam
|
1200-1400
|
Access zone-F to change the ion gauge
filaments at sector 40
|
Goeppner
|
No beam
|
1200 -1600
|
Parallel operation of RF2/RF3 systems, restore the system to normal at the end of study
|
Dimonte
Cherbak
|
Stored beam and injection
|
1400-1600
|
Booster operator requalification test
|
Banks
|
Stored beam and injection
|
1600-2000
|
Map out the PCgun cathode quantum efficiency, injection possible.
|
Lewellen
|
Stored beam and injection
|
1800-2200
|
ID xbpm gain measurement
|
Hahne
|
Stored beam and injection
|
2000-2400
|
Booster transverse injection controllaw studies
|
Sereno
|
Stored beam and injection
|
2200-2400
|
Beam history studies
|
C. Wang
|
Stored beam and injection
|
|
Tuesday 11/05/02
|
|
|
0000-0400
|
Booster transverse injection controllaw studies
|
Sereno
|
Stored beam and injection
|
0400-0600
|
Booster operator training
|
OPS
|
Stored beam and injection
|
0000-0200
|
Beam history studies
|
C. Wang
|
Stored beam and injection
|
0200-0900
|
Cogging and Xbpm feedforward
|
Decker
Singh
|
Stored beam and injection
|
0900-1300
|
datapool test
|
Emery
Lenkszus
Shang
Soliday
|
Stored beam and injection
|
0800-1600
|
BTS injection studies, including test of the modified booster ES1
|
Emery
|
Stored beam and injection
|
1300-1700
|
ID6 and ID11 BPLD test
|
Pietryla
Lenkszus
|
Stored beam and injection
|
1300-1400
|
SR vp ioc reboot test
|
Maclean
|
Stored beam and injection
|
1700-2100
|
Local impedance measurement
|
Sajaev
|
Stored beam, no injection
|
1700-2100
|
Emittance measurement at the bunch compressor
|
Lewellen
|
Stored beam, no injection
|
1700-2100
|
Return booster ES1 to normal
|
J. Wang
PS group
|
Stored beam, no injection
|
2100-2400
|
Bunch purity vs. linac pulses and PAR rf setup
|
Lumpkin
Yao
Smith
|
Stored beam and injection
|
|
Wednesday 11/06/02
|
|
|
0000-0500
|
Lattice correction for lower emittance config.
|
Sajaev
|
Stored beam and injection
|
0300-0500
|
Booster operator training
|
OPS
|
Stored beam and injection
|
0500-0700
|
Couple bunch instability study
|
Harkay
Yao
|
Stored beam and injection
|
0700-0800
|
Ready for user beam with low emittance top-up
|
OPS
|
Study time available
|
|
End of Studies
|
|
|