Machine Studies

Schedule for Run3-6,2002

November 11 1600 - 12 0800

Time

Descriptions

Studiers

SRStatus

 

Monday 11/11/02

 

 

1600-1615

Collect Xbpm data

Singh

Stored beam, no injection

1600-1630

Update/Test SR video image system

Arnold

Stored beam, no injection

1630-1830

Access zone-F to install an rf cavity

turbo pump controller

Goeppner

Gagliano

No beam

1615-1830

Investigate the problem

with the S38 cavity blowers.

Horan

 

No beam

1630-1830

Fix defective filter boards in S15A:MT, S15B:MT, S16B:MT, S20A:MT and S20B:MT

Fors

No beam

1630-1830

Replace filter on CPU supplies

Deriy

No beam

1630-1700

Replace love controller on S29

Putnam

No beam

1615-1730

Replace linac/PAR ACIS UPS

Hogrefe

No beam

1615-1830

Access linac/PAR to investigate L1 corrector supplies

Hillman

No beam

1615-1830

Access the PAR to check kicker ground connection

J. Wang

No beam

1615-1830

Re-check QF supply in the booster

Hillman

No beam

1800-2000

Change lattice

Emery

Stored beam and injection

2000-2400

Orbit Recovery

Singh

Emery

Stored beam and injection

 

Tuesday 11/12/02

 

 

0000-0200

Injection tune-up

Emery

Stored beam and injection

0200-0400

Booster operator training

OPS

 

Stored beam and injection

0500-0700

BPM history study

C. Wang

Stored beam and injection

0600-0610

Switch to SR pump 518

Ferry

Stored beam and injection

0700-0800

Ready for user beam with high emittance, non-top-up and 1+22x1 fill pattern

OPS

Yao

Banks

Stored beam and injection

 

End of Studies