Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Thursday 11/28/02
|
|
|
0000-0100
|
Switch from RF3 to RF2 so that the anode tank lift
work on RF3 can be completed
|
Nassiri
|
No beam
|
0000-0200
|
Two hours to open the test
stand bunker and install a blanking plate
|
Nassiri
|
No beam
|
0200-0300
|
Restore stored beam
|
OPS
|
Stored beam and injection
|
0200-0400
|
PAR/Booster operator training
|
OPS
Banks
|
Stored beam, and injection
|
0400-0800
|
Datapool performance in reducing rms motion and RTFS adjustments
|
Emery
|
Stored beam and injection
|
0800-1200
|
Local impedance measurement
|
Emery
|
Stored beam and injection
|
1200-1600
|
Checking emittance reduction with shifted RF frequency
|
Emery
|
Stored beam and injection
|
1600-1800
|
PAR/Booster operator training
|
OPS
Banks
|
Stored beam and injection
|
1600-2000
|
BPM work for hybrid fill
|
Singh
|
Stored beam and injection
|
2000-2400
|
NbBpm tests
|
Singh
|
Stored beam and injection
|
|
Friday 11/29/02
|
|
|
0000-0700
|
BPM feedforward studies
|
Decker
|
Stored beam and injection
|
0700-0800
|
Ready hybrids (1+8x7) fill pattern, low emit. lattice and top-up
|
OPS
Yao
|
Stored beam and injection
|
|
End of Studies
|
|
|