Machine Studies

Schedule for Run1-10,2003

April 1st, 0800 - April 1st, 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 04/01/03

 

 

0800-1200

SR dipole investigation.

Fors

No beam

0800-1100

Remove waveguide blanking plate at RF1. Investigate RF4 power monitor problem.

RF

No beam

0800-0900

Vacuum readback problem investigation.

Stein

No beam

0800-0900

Identify vacuum valve locations for the next shutdown.

Kruy

ACCESS Booster

0800-0900

Ion pump controller problem investigation.

Gagliano

ACCESS Booster

1200-1300

ID11 rfbpm tests

Singh Sun Erwin

Stored beam and injection

1300-1400

ID35 Xbpm tests.

Singh Hahne

Stored beam and injection

1100-1400

BTS optics study. Parasitic to SR dipole investigation and BPM tests.

Emery

Beam in BTS

1400-1530

Injection optimization.

Emery Sajaev

Stored beam and injection

1530-1600

Prepare for user operation, low emittance, topup, singlets.

Yao

Stored beam and injection