Machine Studies

Schedule for Run1-3,2003

February 10th, 0800 - February 12th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 02/10/03

 

 

0800-1200

Various access and no beam requiring work listed below.

 

No beam

 

Access sector 3. Replace radiation monitors.

Petra

Zone A access

 

Access SR.

Emery

Zone A access

 

Access SR to observe engineer on SR exit port.

Kruy

Zone A access

 

14BM and 33ID UPS troubleshooting.

Behrndt

 

 

16BM wiring removal.

Behrndt

 

 

Turbo controller replacement.

Gagliano

 

 

Converter cabinet work in sector 1.

Markovich

 

 

Jumpered klixons checking.

Fors

 

 

Synchrotron UPS replacement.

Forrestal

Booster in AA mode

 

Gespac interface board swap.

Hillman

 

 

Reset interleaving DSP. May trip ACIS on linac?

Hillman

 

 

Sector 25 noise study.

Fors

 

 

P0 board replacement.

Lenkszus

 

 

Update module position in L4.

Grelick

 

 

Booster and SR septum new PVs test.

Maclean

 

 

RF circulator load replacement

Horan

 

 

Synthesizer replacement

Horan

 

1200-1400

Operator training.

OPS

No beam

1400-1700

110mA injection optimization.

Emery Sereno Decker

Stored beam and injection

1700-1800

Operator training.

OPS

 

1800-2400

Xbpm feedback.

Singh Decker

Stored beam and injection

 

Tuesday, 02/11/03

 

 

0000-0100

Operator training.

OPS

No beam

0100-0900

Check/calibrate Xbpms.

Erwin Hahne

Stored beam

0400-0900

L4 conditioning. Parasitic to Xbpms.

OPS

 

0900-1300

16ID shielding verification.

Ramana-than

Stored beam and injection

0100-1300

OPS training. Parasitic to shielding verification.

OPS

Stored beam and injection

1300-1500

BPLD swaping and verification.

Pietryla

Stored beam and injection

1500-1600

Operator training.

OPS

No beam

1600-1800

"Stationary with beam" tuner control.

RF

Stored beam and injection

1800-2200

Booster chromaticity measurements.

Sereno

Booster beam, no SR beam

2200-2400

Orbit correction with datapool checking.

Emery

Stored beam and injection

 

Wednesday, 02/12/03

 

 

0000-0200

Orbit correction with datapool (continued).

Emery

Stored beam and injection

0200-0500

Setup software for septum feedback.

Emery

Stored beam and injection

0500-0700

Beta function measurements.

Sajaev

Stored beam

0700-0800

Prepare for user run. Lower emittance, topup, 110 mA.

Yao

Stored beam and injection