Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 02/10/03
|
|
|
0800-1200
|
Various access and no beam requiring work listed below.
|
|
No beam
|
|
Access sector 3. Replace radiation monitors.
|
Petra
|
Zone A access
|
|
Access SR.
|
Emery
|
Zone A access
|
|
Access SR to observe engineer on SR exit port.
|
Kruy
|
Zone A access
|
|
14BM and 33ID UPS troubleshooting.
|
Behrndt
|
|
|
16BM wiring removal.
|
Behrndt
|
|
|
Turbo controller replacement.
|
Gagliano
|
|
|
Converter cabinet work in sector 1.
|
Markovich
|
|
|
Jumpered klixons checking.
|
Fors
|
|
|
Synchrotron UPS replacement.
|
Forrestal
|
Booster in AA mode
|
|
Gespac interface board swap.
|
Hillman
|
|
|
Reset interleaving DSP. May trip ACIS on linac?
|
Hillman
|
|
|
Sector 25 noise study.
|
Fors
|
|
|
P0 board replacement.
|
Lenkszus
|
|
|
Update module position in L4.
|
Grelick
|
|
|
Booster and SR septum new PVs test.
|
Maclean
|
|
|
RF circulator load replacement
|
Horan
|
|
|
Synthesizer replacement
|
Horan
|
|
1200-1400
|
Operator training.
|
OPS
|
No beam
|
1400-1700
|
110mA injection optimization.
|
Emery Sereno Decker
|
Stored beam and injection
|
1700-1800
|
Operator training.
|
OPS
|
|
1800-2400
|
Xbpm feedback.
|
Singh Decker
|
Stored beam and injection
|
|
Tuesday, 02/11/03
|
|
|
0000-0100
|
Operator training.
|
OPS
|
No beam
|
0100-0900
|
Check/calibrate Xbpms.
|
Erwin Hahne
|
Stored beam
|
0400-0900
|
L4 conditioning. Parasitic to Xbpms.
|
OPS
|
|
0900-1300
|
16ID shielding verification.
|
Ramana-than
|
Stored beam and injection
|
0100-1300
|
OPS training. Parasitic to shielding verification.
|
OPS
|
Stored beam and injection
|
1300-1500
|
BPLD swaping and verification.
|
Pietryla
|
Stored beam and injection
|
1500-1600
|
Operator training.
|
OPS
|
No beam
|
1600-1800
|
"Stationary with beam" tuner control.
|
RF
|
Stored beam and injection
|
1800-2200
|
Booster chromaticity measurements.
|
Sereno
|
Booster beam, no SR beam
|
2200-2400
|
Orbit correction with datapool checking.
|
Emery
|
Stored beam and injection
|
|
Wednesday, 02/12/03
|
|
|
0000-0200
|
Orbit correction with datapool (continued).
|
Emery
|
Stored beam and injection
|
0200-0500
|
Setup software for septum feedback.
|
Emery
|
Stored beam and injection
|
0500-0700
|
Beta function measurements.
|
Sajaev
|
Stored beam
|
0700-0800
|
Prepare for user run. Lower emittance, topup, 110 mA.
|
Yao
|
Stored beam and injection
|