Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 02/18/03
|
|
|
0800-1000
|
Gespac card replacement in sector 9.
|
Fors
|
No beam
|
|
Continue inspection of shorted klixons.
|
Fors
|
No beam
|
|
PEK4 DAC dropping investigation.
|
Fors
|
No beam
|
|
Sector 38 RAW supply checking.
|
Fors
|
No beam
|
0800-0815
|
SR WG switch to RF3 and RF4.
|
Cours
|
No beam
|
0800-0900
|
Linac water station shutdown.
|
Dortwegt
|
No beam
|
1000-1200
|
S38 cavity 4 tuner control test.
|
Dimonte Harkay Horan
|
Stored beam and injection
|
1200-1300
|
Steering the beam to investigate ceramic chamber temperature.
|
Decker
|
Stored beam
|
1300-1430
|
Data pool orbit correction.
|
Emery
|
Stored beam and injection
|
1430-1500
|
Switch back to RF1 (if required)
|
RF
|
No beam
|
1500-1600
|
Prepare for user operation.
|
Yao
|
Stored beam and injection
|