Machine Studies

Schedule for Run1-4,2003

February 18th, 0800 - February 18th, 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 02/18/03

 

 

0800-1000

Gespac card replacement in sector 9.

Fors

No beam

 

Continue inspection of shorted klixons.

Fors

No beam

 

PEK4 DAC dropping investigation.

Fors

No beam

 

Sector 38 RAW supply checking.

Fors

No beam

0800-0815

SR WG switch to RF3 and RF4.

Cours

No beam

0800-0900

Linac water station shutdown.

Dortwegt

No beam

1000-1200

S38 cavity 4 tuner control test.

Dimonte Harkay Horan

Stored beam and injection

1200-1300

Steering the beam to investigate ceramic chamber temperature.

Decker

Stored beam

1300-1430

Data pool orbit correction.

Emery

Stored beam and injection

1430-1500

Switch back to RF1 (if required)

RF

No beam

1500-1600

Prepare for user operation.

Yao

Stored beam and injection