Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 03/10/03
|
|
|
0800-0830
|
Collect orbit data. Mandatory refill to 100mA at 0800.
|
Singh
|
Stored beam
|
0730-0930
|
Condition and setup RF Gun 1. All studies will be done with RF Gun 1. Parasitic to collect orbit and orbit recovery.
|
Pasky
|
Limited injection
|
0830-0930
|
Switch from high to low emittance
|
Emery Sajaev
|
Stored beam and injection
|
0930-1300
|
Low emittance orbit recovery
|
Singh
|
Stored beam and injection
|
0900-1800
|
PTB bpms commissioning. Parasitic, starts as soon as RF Gun 1 is done.
|
Keane Zabel Erwin
|
Continuous injection to PTB
|
1130-1300
|
Linac training. Parasitic to orbit recovery.
|
OPS
|
Limited injection
|
1300-1500
|
Decoherence study.
|
CX Wang
|
Stored beam and injection
|
1300-1500
|
RF power monitor investigation. Parasitic to decoherence.
|
Grelick
|
|
1500-1900
|
Tune slope with chromaticity using beam history.
|
Chae Wang
|
Stored beam and injection
|
1900-2300
|
Xbpm tests
|
Hahne
|
Stored beam and injection
|
2300-2400
|
Bunch length measurements
|
Yang Harkay Chae
|
Stored beam and injection
|
|
Tuesday, 02/11/03
|
|
|
0000-0500
|
Bunch length measurements. Continued.
|
Yang Harkay Chae
|
Stored beam and injection
|
0500-0630
|
Booster requalification
|
OPS
|
No injection
|
0700-0900
|
S1 steering magnets investigation.
|
Fors
|
Stored beam
|
0730-0900
|
Linac training. Parasitic to S1 steering magnets.
|
OPS
|
Limited injection
|
0830-0900
|
Interleaving DSP reboot
|
Hillman
|
No injection
|
0900-1000
|
S3 radiation monitors replacement.
|
Petra
|
ACCESS Zone A
|
0900-1000
|
Booster main power supplies reset control line inspection
|
Hillman
|
No beam
|
0900-1030
|
Sextupole tests. Parasitic to access.
|
Puttkammer
|
No SR beam
|
0900-1800
|
PTB bpms commissioning.
|
Keane Zabel Erwin
|
Continuous injection
|
0900-1100
|
SR RF 360 Hz sidebands investigation.
|
Nassiri Horan
|
No SR beam
|
1000-1200
|
Turn off water for L6 klystron.
|
Dorwegt
|
No SR beam
|
1000-1200
|
S4 corrector regulation investigation.
|
Ju Wang
|
No SR beam
|
1030-1200
|
S40 and S1 PSCU work.
|
Puttkammer
|
No SR beam
|
1100-1200
|
S38 cavities detuning.
|
Nassiri Horan Harkay
|
No SR beam
|
1200-1300
|
S38 cavities detuning with 112 mA beam.
|
Nassiri Horan Harkay
|
Stored beam and injection
|
1300-1500
|
Low emittance injection optimization.
|
Emery Sajaev
|
Stored beam and injection
|
1500-1900
|
Datapool orbit correction.
|
Emery
|
Stored beam and injection
|
30 minutes
during 1500-1900
|
Switch back to RF Gun 2. Parasitic to datapool.
|
OPS Pasky
|
Limited injection
|
1900-2200
|
CPU perturbation measurements.
|
Emery
|
Stored beam and injection
|
2200-2400
|
Emittance with RF frequency.
|
Emery Sajaev
|
Stored beam and injection
|
|
Wednesday, 02/12/03
|
|
|
0000-0100
|
Emittance with RF frequency. Continued.
|
Emery Sajaev
|
Stored beam and injection
|
0100-0700
|
Local impedance measurements.
|
Sajaev
|
Stored beam and injection
|
1.5 hours during 0100-0700
|
Booster requalification.
|
OPS
|
No injection
|
0700-0800
|
Prepare for user run.
|
Sajaev
|
Stored beam and injection
|