Machine Studies

Schedule for Run1-9,2003

March 24th, 0800 - March 26th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 03/24/03

 

 

0800-1100

Switch to RG1, and PEM testing.

Pasky Soliday

No beam

0800-1000

Switch to RF1/RF3. Parasitic to RG1 switch.

RF

No beam

0800-0830

Feedback IOCs reboot.

Lenkszus

No beam

0800-1000

Install troubleshooting hardware for S33B:V1

Fors Maclean

No beam

1030-1100

L6 water bypass installation. Parasitic to RG1 switch.

Dortwegt

 

1100-1500

Datapool testing.

Emery

Stored beam and injection

1200-1400

Booster requalification. Parasitic to datapool.

OPS

Limited injection

1500-1700

Decoherence study.

CX Wang

Stored beam and injection

1700-2100

324 bunches exercise

Emery Singh Harkay Sajaev

Stored beam and injection

2100-2400

Local impedance using orbit bump.

Emery

Stored beam and injection

1.5 hours

during 1700-2200

OPS training. Parasitic.

OPS

Limited injection

 

Tuesday, 02/25/03

 

 

0000-0100

Local impedance using orbit bump. Continued.

Emery

Stored beam and injection

0100-0300

Lattice test for local impedance.

Sajaev

Stored beam and injection

0300-0800

Local impedance using response matrices.

Sajaev

Stored beam

0300-0500

Booster requalification. Parasitic to local impedance.

OPS

Limited injection

0500-1200

Direct injection from PC gun to booster.

Lewellen

No SR injection

0800-1000

BPM check.

Erwin

ACCESS Zone F

0800-1000

Replace radiation monitor.

Petra

ACCESS Zone A

0800-1000

Remove copper tubes in S23 and inspect SRE valve support.

Kruy

ACCESS Zone C

1000-1130

PCSU repair in S39 and S1.

Puttkammer

No beam

1000-1200

S:BM current change.

Fors

No beam

1200-1600

CPU studies.

Emery Vasserman

Stored beam and injection

1300-1500

Booster requalification.

OPS

Limited injection

1600-1900

112mA operation tests.

Nassiri Harkay

Stored beam and injection

1900-2200

Beam energy dependent emittance.

Emery

Stored beam and injection

1.5 hours during 1500-2200

OPS training.

OPS

Limited injection

2200-2400

Low emittance injection optimization.

Emery

Stored beam and injection

 

Wednesday, 03/26/03

 

 

0000-0200

Low emittance injection optimization. Continued.

Emery

Stored beam and injection

0200-0630

Corrector noise study.

Fors Yao

Stored beam and injection

2 hours during 2300-0600

Booster requalification. Parasitic.

OPS

Limited injection

0630-0700

Undo RF switch.

RF

No beam

0630-0700

Undo S33B:V1 troubleshooting hardware.

Fors Maclean

No beam

0700-0800

Prepare for user operation. Low emittance, singlets.

Yao

Stored beam and injection