Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Thursday, 05/22/03
|
|
|
0800-1600
|
Setup low emittance lattice
|
Emery
Sajaev
|
Stored beam and injection
|
0800-1000
|
Test newly configured SR tune system
|
Yao
Gold
|
Stored beam and injection
|
1600-2000
|
BTS optics
|
Emery
Sereno
|
Stored beam and injection
|
2000-2400
|
BPLD/DBPLD validation
|
Pietryla
|
Stored beam and injection
|
|
Friday, 05/23/03
|
|
|
0000-0800
|
BPM commissioning and reconfiguration
|
Decker
|
Stored beam and injection
|
0800-1600
|
Linac energy gain measurement (injection may be needed)
|
Lewellen
|
Stored beam and injection
|
0800-0900
|
Response matrix measurement
|
Sajaev
|
Stored beam and injection
|
0900-1100
|
Beta-function correction #1
|
Sajaev
|
Stored beam and injection
|
1100-1500
|
CPU adjustment for Vplane
|
Vasserman
Emery
|
Stored beam and injection
|
1500-1700
|
Canted undulator magnet commissioning
|
Emery
|
Stored beam and injection
|
1700-2100
|
Canted undulator photon conditioning
|
Emery
|
Stored beam and injection
|
2100-2400
|
2ID BPLD test under 324 bunch pattern
|
Pietryla
|
Stored beam and injection
|
|
Saturday, 05/24/03
|
|
|
0000-0800
|
BPM test and orbit recovery
|
Hahne
Erwin
|
Stored beam and injection
|
0800-1600
|
324-bunch bpm cogging refinement
|
Decker
|
Stored beam and injection
|
1600-2000
|
Studies time available
|
|
Stored beam and injection
|
2000-2400
|
Single bunch driving impedance
|
Harkay
Chae
|
Stored beam and injection
|
|
Sunday, 05/25/03
|
|
|
0000-0400
|
S35 beamline setup
|
Yang
|
Stored beam and injection
|
0400-0800
|
Beta-function correction
|
Sajaev
|
Stored beam and injection
|
0800-1200
|
Steer lower emittance lattice with higher RF frequency
|
Emery
|
Stored beam and injection
|
1200-1600
|
Implement RTFB with new bpms and new software.
|
Emery
Shang
|
Stored beam and injection
|
1600-2400
|
To be determined
|
|
Stored beam and injection
|
|
Monday, 05/26/03
|
|
|
0000-0400
|
To be determined
|
|
Stored beam and injection
|
0400-0800
|
Multibunch instability #1
|
Harkay
|
Stored beam and injection
|
0800-1200
|
Multibunch instability #2
|
Harkay
|
Stored beam and injection
|
1200-1800
|
Single bunch instability
|
Chae
Harkay
Yang
|
Stored beam and injection
|
1800-2400
|
BPM test and orbit restore
|
Singh
Hahne
Erwin
|
Stored beam and injection
|
|
Tuesday, 05/27/03
|
|
|
0000-0700
|
BPM test and orbit restore
|
Singh
Hahne
Erwin
|
Stored beam and injection
|
0800-1600
|
PC gun checkout (parasitic)
|
Lewellen
|
Stored beam and injection
|
0700-1100
|
CPU adjustment for Vplane
|
Vasserman
Emery
|
Stored beam and injection
|
1100-1200
|
Testing EPICS displays at 23ID and 31ID, will close and open shutters
|
Behrndt
|
Stored beam and injection
|
1100-1700
|
Drive amplifier phase matching, beam excitation, bpm history, and S35 pinhole imaging
|
Yao
Chae
Gold
Yang
Lumpkin
|
Stored beam and injection
|
1700-1800
|
Beta-function correction #2
|
Sajaev
|
Stored beam and injection
|
1800-2400
|
Local impedance studies
|
Sajaev
|
Stored beam and injection
|
|
Wednesday, 05/28/03
|
|
|
0000-0400
|
Characterize injection effects on stored beam
|
Emery
|
Stored beam and injection
|
0400-0700
|
Measure SR pulsed magnet jitter on injector trajectory for MIA analysis
|
Emery
|
Stored beam and injection
|
0700-0800
|
324 bunch-low emittance-non-top user beam
|
OPS
Yao
|
Stored beam and injection
|