Machine Studies

Schedule for Run2-10,2003

July 28th, 0800 - July 30th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 07/28/03

 

 

0800-1000

Replace 4 AV3 corrector power supplies in S2,3,4,5

J. Wang

No beam

0800-1100

S13B:V3 noise problem

Fors

No beam

0800-1100

Install the update controllaw on datapool and ioclid[1-5]

Soliday

No beam

0800-1000

Access booster to inspect beam dump area

Decker

Visitors

No beam

0800-1000

Troubleshooting a hardware problem on iocleutl1

Stevens

No beam

0800-1000

Control access Zone-F to replace IK2 blower

Putnam

No beam

0800-1000

Access Zone-F to check S40C2 tuner finger

Cherbak

No beam

0800-1100

Authorize access Zone-E to Install water cooled BPM test stand in sector 31 BM area

Putnam

No beam

0800-1200

Linac L5 RF test

Cours

No beam

0800-0900

RF waveguide switch

Nassiri

RF group

 

No beam

0900-1100

RF1 power monitor board upgrade

Grelick

No beam

0800-1200

Flash TSP filaments in S23 front end (No impact on other study except for slight possibility of beam loss)

Wiemerslage

No beam

1200-1800

Booster injection controllaw response measurement (parasitic)

Sereno

Stored beam and injection

1200-1800

Instability study

CX Wang

Stored beam and injection

1800-2400

Direct injection into Booster to fill SR.

Sereno

Emery

Stored beam and injection

 

Tuesday, 07/29/03

 

 

0000-0400

Canted undulator X-ray BPM study(I)

Emery

Stored beam and injection

0400-1200

ID gap FF scan to add more X-bpms to orbit controllaw

Decker

Stored beam and injection

1200-1600

RTFB test

Lenkszus

Singh

Emery

Stored beam and injection

1600-2000

Canted undulator X-ray BPM study(II)

Emery

Stored beam and injection

2000-2300

Test new top-up timer PV which will allow a shorter number of pre-pulses.

Emery

Stored beam and injection

2300-2400

23/24 bunch cogging implementation

Decker

Stored beam and injection

 

Wednesday, 07/30/03

 

 

0000-0700

23/24 bunch cogging implementation

Decker

Stored beam and injection

0700-0800

Ready for 1+22 fill pattern, low emittance, and top-up

OPS

Yao

Stored beam and injection