Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 07/28/03
|
|
|
0800-1000
|
Replace 4 AV3 corrector power supplies in S2,3,4,5
|
J. Wang
|
No beam
|
0800-1100
|
S13B:V3 noise problem
|
Fors
|
No beam
|
0800-1100
|
Install the update controllaw on datapool and ioclid[1-5]
|
Soliday
|
No beam
|
0800-1000
|
Access booster to inspect beam dump area
|
Decker
Visitors
|
No beam
|
0800-1000
|
Troubleshooting a hardware problem on iocleutl1
|
Stevens
|
No beam
|
0800-1000
|
Control access Zone-F to replace IK2 blower
|
Putnam
|
No beam
|
0800-1000
|
Access Zone-F to check S40C2 tuner finger
|
Cherbak
|
No beam
|
0800-1100
|
Authorize access Zone-E to Install water cooled BPM test stand in sector 31 BM area
|
Putnam
|
No beam
|
0800-1200
|
Linac L5 RF test
|
Cours
|
No beam
|
0800-0900
|
RF waveguide switch
|
Nassiri
RF group
|
No beam
|
0900-1100
|
RF1 power monitor board upgrade
|
Grelick
|
No beam
|
0800-1200
|
Flash TSP filaments in S23 front end (No impact on other study except for slight possibility of beam loss)
|
Wiemerslage
|
No beam
|
1200-1800
|
Booster injection controllaw response measurement (parasitic)
|
Sereno
|
Stored beam and injection
|
1200-1800
|
Instability study
|
CX Wang
|
Stored beam and injection
|
1800-2400
|
Direct injection into Booster to fill SR.
|
Sereno
Emery
|
Stored beam and injection
|
|
Tuesday, 07/29/03
|
|
|
0000-0400
|
Canted undulator X-ray BPM study(I)
|
Emery
|
Stored beam and injection
|
0400-1200
|
ID gap FF scan to add more X-bpms to orbit controllaw
|
Decker
|
Stored beam and injection
|
1200-1600
|
RTFB test
|
Lenkszus
Singh
Emery
|
Stored beam and injection
|
1600-2000
|
Canted undulator X-ray BPM study(II)
|
Emery
|
Stored beam and injection
|
2000-2300
|
Test new top-up timer PV which will allow a shorter number of pre-pulses.
|
Emery
|
Stored beam and injection
|
2300-2400
|
23/24 bunch cogging implementation
|
Decker
|
Stored beam and injection
|
|
Wednesday, 07/30/03
|
|
|
0000-0700
|
23/24 bunch cogging implementation
|
Decker
|
Stored beam and injection
|
0700-0800
|
Ready for 1+22 fill pattern, low emittance, and top-up
|
OPS
Yao
|
Stored beam and injection
|