Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 08/26/03
|
|
|
0000-0030
|
Collect Xbpm reference data
|
Singh
OPS
|
Stored beam and injection
|
0030-0230
|
Booster direct injection training
|
Schroeder
|
Stored beam and injection
|
0230-0700
|
Analyze the BPM upgrade performance
|
Singh
Lill
|
Stored beam and injection
|
0700-0800
|
BTFB system reboot test
|
Lenkszus
|
Stored beam and injection
|
0800-1100
|
Corrector regulator noise test
|
Fors
Yao
|
Stored beam and injection
|
1100-1700
|
HOM-induced instability studies
|
Harkay
|
Stored beam and injection
|
1700-2000
|
MIA BPM history measurement
|
Harkay
|
Stored beam and injection
|
2000-2200
|
Gated camera imaging with 35-ID beam
|
Yang
|
Stored beam and injection
|
2200-2400
|
Control access into the SR on the 26th of
August (last intervention day) in order to perform an IR scan of the SR
dipole buss system. Working warm
|
Markovich
|
|
|
End of Run
|
|
|