Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Friday, 07/04/03
|
|
|
0800-0900
|
Zone F access to check sector 40 ik4 downstream bellows top air cooling
blower hose during next machine intervention.
|
Putnam
|
No beam
|
0800-1000
|
Control access to Zone-D to lock 23ID shutter, LOTO switch gear required
|
Merritt
|
No beam
|
0800-0900
|
Replace erratic SR absorber Love controller in sector 40 circuit 1.
|
Putnam
|
No beam
|
1000-1800
|
X-BPM feedback/feedforward
|
Decker
|
Stored beam and injection
|
1800-2400
|
Single bunch studies vs rf freq.
Injection is required.
|
Harkay
|
Stored beam and injection
|
|
Saturday, 07/05/03
|
|
|
0000-0200
|
Operator storage ring training
|
Christensen
|
|
0200-0500
|
RTFB instability study
|
Emery
|
Stored beam and injection
|
0500-0700
|
Studies time available
|
|
Stored beam and injection
|
0700-0800
|
Singlet fill pattern, low emittance, top-up user beam
|
OPS
Yao
|
Stored beam and injection
|