Machine Studies

Schedule for Run2-8,2003

July 14th, 0800 - July 16th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 07/14/03

 

 

0800-0815

Get reference orbit

Singh

Stored beam and injection

0830-1030

AA access to Booster for OSHA inspection

Chang

No beam

0930-1130

AA access to Zone-A for OSHA inspection

Chang

No beam

1030-1130

AA access to LEUTLfor OSHA inspection

Chang

No beam

0830-1030

RTFB feedback software test

Lenkszus

No beam

0830-1030

Checking S38C3 cavity coupler body temp, control access to Zone-F if needed.

Nassiri

No beam

0830-0930

Zone A (sector 4) access to place dosimeters on top of the device. will need the ID gap open.

Petra

No beam

0830-1000

Test the Booster RF Power Monitor and reboot iocsrmon

DiMonte

No beam

0830-0930

Reset ion pump controller sector 23 section, reset ion pump controller sector 1 section 4 and replace ion pump controller sector 40 sections 1,2.

Gagliano

No beam

0830-1030

Access S23 (Zone C) to check vacuum

Gagliano

No beam

0830-1230

Reliability tests on all FEEPS/PSS for S8 thru 35

Behrndt

No beam

0830-1000

Swap and test S32A:V3 CMPSI card

Pietryla

No beam

0830-1030

Check S13B:V3 noise problem

J. Wang

No beam

0930-1030

Software test

Shang

Emery

No beam

1230-1430

Direct injection into Booster

Sereno

Emery

Stored beam and injection

1430-1800

RTFB stability with matrix errors

Emery

Stored beam and injection

1600-1800

Test 1GHz ADC with bunch current signal

Lenkszus

Stored beam and injection

1800-2400

X-ray bpm feedforward implementation (I)

Decker

Stored beam and injection

1800-2400

Commission horizontal injection controllaw in booster.

Sereno

Stored beam and injection

 

Tuesday, 07/15/03

 

 

0000-0600

Single bunch instability study

CX Wang

Stored beam and injection

0600-1000

User beam orbit recovery

Singh

Stored beam and injection

0800-0900

Access linac/PAR to verify LTP documentation

Grabinski

S. Berg

No beam

1000-1200

Shielding verification for 16BM (10mA and 30 mA)

Mohan

Stored beam and injection

1200-1300

Verify ioc reboot procedure

Flood

Stored beam and injection

1300-1800

Long straight section lattice study

Sajaev

Stored beam and injection

1800-2400

X-ray bpm feedforward implementation (II)

Decker

Stored beam and injection

 

Wednesday, 07/16/03

 

 

0000-0700

Beam profile measurement

Chae

Yang

Stored beam and injection

0700-0800

Ready for 1x22 fill pattern, low emittance, and top-up

OPS

Sajaev

Stored beam and injection