Machine Studies

Schedule for Run2-9,2003

July 22nd, 0800 - July 22nd, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 07/22/03

 

 

0800-1000

Replace UPS at 8BM and 35ID.

Behrndt

No beam

0800-0900

Verify Altera version on DAC cards for L1:SC3 and L1:SC4

Hillman

No beam

0800-1000

L2 closed loop water station work

Dortwegt

No beam

0800-0900

Replace blowers in rack S27-04 and investigate dirty power trip in sectors 11/12.

Gold

No beam

0800-0900

Investigate S22 PSCU communication problem

Wang

No beam

0800-1000

Investigate S13B:V3 readback noise problem

Fors

No beam

0800-0900

Reboot 16 RF iocs.

DiMonte

No beam

1000-1200

Align ID and BM Xbpm stages.

Hahne

Stored beam and injection

1200-1400

Storage ring requalification.

Christensen

Stored beam and injection

1400-1530

Instability study.

CX Wang

Stored beam and injection

1530-1600

Prepare for user run.

OPS

Sajaev

Stored beam and injection