Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 07/22/03
|
|
|
0800-1000
|
Replace UPS at 8BM and 35ID.
|
Behrndt
|
No beam
|
0800-0900
|
Verify Altera version on DAC cards for L1:SC3 and L1:SC4
|
Hillman
|
No beam
|
0800-1000
|
L2 closed loop water station work
|
Dortwegt
|
No beam
|
0800-0900
|
Replace blowers in rack S27-04 and investigate dirty power trip in sectors 11/12.
|
Gold
|
No beam
|
0800-0900
|
Investigate S22 PSCU communication problem
|
Wang
|
No beam
|
0800-1000
|
Investigate S13B:V3 readback noise problem
|
Fors
|
No beam
|
0800-0900
|
Reboot 16 RF iocs.
|
DiMonte
|
No beam
|
1000-1200
|
Align ID and BM Xbpm stages.
|
Hahne
|
Stored beam and injection
|
1200-1400
|
Storage ring requalification.
|
Christensen
|
Stored beam and injection
|
1400-1530
|
Instability study.
|
CX Wang
|
Stored beam and injection
|
1530-1600
|
Prepare for user run.
|
OPS
Sajaev
|
Stored beam and injection
|