Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/2/03
|
|
|
1600-1615
|
Record XBPM data for user orbit.
|
OPS
|
SR Beam
|
1615-2200
|
Orbit set-up for hybrid singlet mode with cogging.
|
Singh Decker
|
Stored beam and injection
|
2200-2400
|
Singlet hybrid mode with maximum single bunch current. Test with user.
|
Harkay Sajaev
|
Stored beam and injection
|
|
Wednesday, 12/3/03
|
|
|
0000-0300
|
Singlet hybrid mode with maximum single bunch current. Test with user (continued).
|
Harkay Sajaev
|
Stored beam and injection
|
0300-0500
|
Operator training.
|
OPS
|
No injection
|
0500-0700
|
RTFB rebooting tests.
|
Emery Lenkszus
|
Stored beam and injection
|
0700-0800
|
Beam steering in S36 cavity
|
Emery RF
|
Stored beam and injection
|
0800-0900
|
Unlock 23ID & 24ID's shutters in preparation for shielding verifications
|
Mohan
|
Access Zone-D
|
0800-0900
|
Check new BESOCM cables in the tunnel
|
Brill
|
PAR Access
|
0800-0900
|
Photograph area between L:AS2-AS3
|
S. Berg
|
Linac Access
|
0800-1100
|
Install a 60A 208Vac circuit breaker within the RF test stand breaker panel.
|
Trento
|
No beam
|
0800-0900
|
Replace Johnson controls digital input module for RF pumps 901 and 902.
|
Ferry
|
No beam
|
0830-0930
|
Replace 3ID & 4ID dosimeters under a working Warm Procedure
|
Petra
|
Access
Zone A
|
0830-1030
|
Replace blowers on S39IK2.
|
Morrison
|
Access Zone F
|
0900-1100
|
Reprogram CPU at 0900, then starting from 0930 CPU magnet tests.
|
Smith Emery
|
No beam
|
0900-1100
|
PCG Laser alignment.
|
Yuelin Li
|
Linac Access
|
0900-1100
|
23ID & 24ID PSS & EPS work, can not start until shutters are unlocked.
|
Hawkins
|
No Beam
|
0900-0930
|
Reboot IOCS21VP.
|
CTL
|
No Beam
|
1100-1130
|
Recover injector equipment and fill 10mA.
|
OPS
|
Recovery
|
1130-1530
|
Shielding Verifications 23ID & 24ID at 10mA then 30mA.
|
Mohan
|
Stored beam and injection
|
1130-1430
|
2hrs. Operator Linac training, one SR injection to 30mA during this period.
|
OPS
|
Stored beam and injection
|
1530-1630
|
Lock out the 23ID & 24ID's shutters.
|
Mohan
|
Access Zone-D
|
1630-1700
|
Recover beam.
|
OPS
|
Stored beam and injection
|
1700-2300
|
Par bunch cleaning and bunch purity vs. par rf. Fill 5mA single bunch at the end of the shift for next SR study.
|
Sereno Borland
|
Stored beam and injection
|
2300-2400
|
LEUTL for SPIRIT operation.
|
Lewellen
|
Infrequent injection possible
|
|
Thursday, 12/4/03
|
|
|
0000-0330
|
LEUTL for SPIRIT operation (continued).
|
Lewellen
|
Infrequent injection possible
|
2300-0330
|
Single bunch motion imaging. Parallel to LEUTL.
|
Yang Chae
|
Stored beam
|
0330-0530
|
Operator training.
|
OPS
|
No injection
|
0530-0730
|
S35 bpm noise study.
|
Lenkszus Laird Erwin singh
|
Stored beam and injection
|
0730-0800
|
Ready for 1+8X7 fill pattern, low emittance, TopUp, cogging
|
OPS
|
Stored beam and injection
|