Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/9/03
|
|
|
0800-0815
|
Record XBPM data for user orbit.
|
OPS
|
SR Beam
|
0815-0900
|
Install Timing card in iocmtime for SR pre-trigger to A014.
|
Lenkszus
|
Risk of beam loss
|
0815-0830
|
RF work.
|
RF group
|
Possible beam loss
|
0815-0900
|
FE EPS software changes in Sector 9.
|
Behrndt
|
Risk of beam loss
|
0900-1000
|
Test MXI/VXI fix for power PC processor in Booster BPM iocbbpm1
|
Lenkszus
|
Injection available
|
0830-1030
|
CPU fast ramp tests. Parallel to timing card, FE EPS, etc.
|
Emery Smith
|
Stored beam and injection
|
1030-1330
|
Gap scans.
|
Decker
|
Stored beam and injection
|
1330-1500
|
OAG presentation.
|
OAG
|
Stored beam and injection
|
1500-1600
|
Ready for 1+8x7 hybrid fill pattern, topup, cogging, 8mA in the main bunch.
|
Sajaev OPS
|
Stored beam and injection
|