Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 12/15/03
|
|
|
1600-1615
|
Record XBPM data for user orbit
|
OPS
|
SR Beam
|
1600-1800
|
PCG Laser Alignment
|
Yuelin Li
|
Linac Access
|
1615-1800
|
Troubleshoot 17ID PS2 switch problem
|
Friedman
|
Zone C Access
|
1615-1700
|
RF2->RF3 Bldg. 420 Waveguide switch
|
Ali Nassiri
|
No Beam
|
1615-1645
|
Remote reset of S22 PSCU
|
Phil McNamara
|
Risk of Beam loss
|
1615-1700
|
Swap RS-232 PLC with a RS-422 PLC linked to iocrf5cavn; reboot required.
|
Jim Stevens
|
No impact
|
1800-1900
|
Test bunch train software for next week 300mA attempt.
|
Borland Emery
|
Stored beam and injection
|
1900-2000
|
Lattice addjustment for 324 bunches.
|
Sajaev
|
Stored beam and injection
|
2000-2400
|
BPM database for 324 bunches.
|
Singh Decker
|
Stored beam and injection
|
|
Tuesday, 12/16/03
|
|
|
0000-0400
|
Par bunch cleaning.
|
Sereno
|
Stored beam and injection
|
0200-0400
|
Booster RF scan for injection. Parallel to par bunch cleaning.
|
Emery Sereno
|
Stored beam and injection
|
0400-0700
|
CPU ramping test with the ID4 user. Last two hours parallel to OPS training with one injection possible.
|
Emery Smith
|
Stored beam and injection
|
0500-0700
|
Operator PAR console test.
|
Jones Shumard
|
Stored Beam
|
0700-0800
|
Ready for 0+324X1 fill pattern, low emittance, non-TopUp
|
OPS
|
Stored beam and injection
|