Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 10/13/03
|
|
|
0800-0820
|
Acquire BPM reference data
|
Singh
|
Stored beam and injection
|
0800-0820
|
Acquire SR pulsed waveforms
|
Jones
|
Stored beam and injection
|
0830-1030
|
Access to Zone-E to test S35B:P1, LOTO double sector 34/35
|
Keane
Gold
|
No beam
|
0830-1030
|
Access to Zone-A to replace an encoder on 3ID
|
Grimmer
|
No beam
|
0830-0930
|
Remove monitoring equipment at 9ID front end EPS
|
Behrndt
M. Smith
|
No beam
|
0830-1130
|
Check and readjust as
necessary linac VSWR blanking in the various switched linac modes (occasional injection possible)
|
Grelick
|
No beam
|
0830-0930
|
Investigate ioc communication problem
|
Gunderson
|
No beam
|
0830-1130
|
Troubleshoot the fiber line providing the CPU AC mode switch trigger (
|
Deriy
|
No beam
|
0830-1030
|
Test Ethernet dual redundant 100/10 media converter with an sr vp and
bpm iocs
|
Lenkszus
|
No beam
|
0830-1030
|
Look into the EMW supply leaking problem
|
McNamara
|
No beam
|
0830-0930
|
Replace blowers on RTFB iocs
|
Gold
|
No beam
|
0830-0930
|
Swap out S23A:V2 Dac board due to readback problem
|
Fors
PS group
|
No beam
|
0830-1230
|
Troubleshoot B:IK noise problem
|
Hillman
|
No beam
|
1130-1530
|
Tune measurement and bunch cleaning study in the PAR
|
Sereno
|
Stored beam and injection
|
1230-1430
|
SR requalification
|
Schroeder
|
Stored beam and injection
|
1430-1830
|
Test 35BP1 and 35BP2 BPMs
|
Erwin
Lill
|
Stored beam and injection
|
1500-1830
|
linac training
|
Keyser
|
Stored beam and injection
|
1830-2300
|
Booster direct injection BPM test
|
Lill
Stein
Sereno
|
Stored beam and injection
|
2300-2400
|
Injector training (2300-0700 13- 14)
|
Flood
|
Stored beam and injection
|
|
Tuesday, 10/14/03
|
|
|
0000-0800
|
Orbit recovery
|
Singh
Decker
|
Stored beam and injection
|
0000-0800
|
Commission and test booster vertical injection controllaw
|
Sereno
|
Stored beam and injection
|
0800-1000
|
Access zone-F to replace cavity blowers.
|
Bromberek
|
No beam
|
0800-1000
|
Remove a waveguide plate on RF1
|
Nassiri
|
No beam
|
0800-1000
|
Control access to Zone-D to remove locks on 23ID front end shutters, check operational readiness
|
Mohan
Friedman
Behrndt
|
No beam
|
0800-1300
|
L1 klystron conditioning (injector available)
|
Pasky
|
Injector available
|
1000-1200
|
10mA shielding verification of 23ID
|
Mohan
|
Stored beam and injection
|
1200-1400
|
30mA shielding verification of 23ID
|
Mohan
|
Stored beam and injection
|
1300-1500
|
Linac qualification
|
Shumard
|
Stored beam and injection
|
1400-1500
|
Control access to Zone-D to put locks on 23ID front end shutters
|
Mohan
|
No beam
|
1500-1700
|
SR requalification test
|
Weyer
|
Stored beam and injection
|
1700-1830
|
Linac operator training
|
Keyser
|
Stored beam and injection
|
1700-2100
|
RTFB config. study
|
Singh
Decker
|
Stored beam and injection
|
2100-2400
|
Transient beam response for MIA analysis
|
Chae
C. Wang
|
Stored beam and injection
|
2300-2400
|
Injector training (injection may be needed)
|
Flood
|
Stored beam and injection
|
|
Wednesday, 10/15/03
|
|
|
0000-0100
|
Transient beam response for MIA analysis
|
Chae
C. Wang
|
Stored beam and injection
|
0100-0400
|
BTS optics/trajectory investigation
|
Emery
|
Stored beam and injection
|
0400-0700
|
Check RTFB feedback matrix with gain included
|
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for 0+24x1 fill, top-up and cogging
|
OPS
Yao
|
Stored beam and injection
|