Machine Studies

Schedule for Run3-5,2003

October 27th, 0800 - October 29th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 10/27/03

 

 

0800-0815

Record user orbit.

Singh

Stored beam

 

 

0800-1000

Replace SF6 switch.

Pasky

Access Linac

Reconfigure PAR tune measurement cables.

Gold

Access PAR Booster

0830-1000. Replace ID radiation monitors.

Petra

Zone A access

0830-1000. Remove water cooled test BPM stand from sector 32 through 31BM ratchet door.

Putnam

Zone E access

Add additional PVs to all SR bpm IOC auto saverestore.

Lenkszus

No beam

Valve interlock tests.

Stein

 

Replace 4 corrector converters.

Wang

 

DSP reboot of the interleaving supplies.

Hillman

 

P:SD and P:Q4 investigation.

Hillman

 

B:IK testing.

Hillman

 

Inspect SR dipole opto cards.

Mcnamara

 

Repair the water leak in L1 and L4.

Dortwegt

 

MPS testing for 31ID and 32ID

Behrndt

 

1000-1030

Recover after the access and inject 102 mA in 24 bunches

OPS

Stored beam and injection

1030-1430

Linac PEM testing.

Sereno Borland Pasky

Occasional injection

1030-1400

Beam steering with 14ID user. Parasitic to Linca PEM testing.

Decker Singh FC

Stored beam

1030-1400

BM/ID xbpm alignment. Parasitic to everything.

Hahne

Stored beam

1430-1700

PAR bunch cleaning testing.

Sereno Borland

Occasional injection

1400-1700

Timing scan and 35ID offsets. Parasitic to PAR bunch cleaning.

Singh Decker

Stored beam

1700-2000

Investigate/verify IOC reboot and cogging procedures.

Banks

Stored beam and injection

1700-1900

PAR operator training. Parasitic to procedures verifications.

Shumard

 

2000-2400

Response matrix measurements for lattice correction and bpm gain measurements. Lattice adjustment for 112 mA operation.

Sajaev

Stored beam and injection

 

Tuesday, 10/28/03

 

 

0000-0400

SR beam history injection transient measurements.

Sereno

Stored beam and injection

0400-0800

SR beam dynamics with horizontal and phase kicks.

Harkay Guo

Stored beam and injection

0800-1400

PTB S-band bpm testing and direct injection.

Sereno

No SR beam

0800-1100

Test new DBPLD database software in iocs1bpm and iocs9bpm. Parasitic to PTB bpm testing.

Pietryla Lenkszus

No SR beam

1100-1200

Test VP ioc and RTFB ioc reboot. Parasitic to PTB testing.

Yao

No SR beam

1400-1600

OPS training.

Weyer

Stored beam and injection

1600-2000

BPM gain installation.

Emery Shang Sajaev

Stored beam and injection

2000-2400

Orbit and DBPLD tests after gain installation.

Singh Erwin

Stored beam and injection

2300-0100

Linac operator training. Parasitic to orbit tests.

Klymowych

 

 

Wednesday, 10/29/03

 

 

0100-0600

Booster vertical injection controllaw studies.

Sereno

No SR beam

0600-0700

Response matrix measurements for gain verification.

Sajaev

Stored beam and injection

0700-0800

Prepare for user run. Topup, 110mA, 24 singlets, cogging.

OPS

Stored beam and injection