Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 10/27/03
|
|
|
0800-0815
|
Record user orbit.
|
Singh
|
Stored beam
|
0800-1000
|
Replace SF6 switch.
|
Pasky
|
Access Linac
|
Reconfigure PAR tune measurement cables.
|
Gold
|
Access PAR Booster
|
0830-1000. Replace ID radiation monitors.
|
Petra
|
Zone A access
|
0830-1000. Remove water cooled test BPM stand from sector 32 through 31BM ratchet door.
|
Putnam
|
Zone E access
|
Add additional PVs to all SR bpm IOC auto saverestore.
|
Lenkszus
|
No beam
|
Valve interlock tests.
|
Stein
|
|
Replace 4 corrector converters.
|
Wang
|
|
DSP reboot of the interleaving supplies.
|
Hillman
|
|
P:SD and P:Q4 investigation.
|
Hillman
|
|
B:IK testing.
|
Hillman
|
|
Inspect SR dipole opto cards.
|
Mcnamara
|
|
Repair the water leak in L1 and L4.
|
Dortwegt
|
|
MPS testing for 31ID and 32ID
|
Behrndt
|
|
1000-1030
|
Recover after the access and inject 102 mA in 24 bunches
|
OPS
|
Stored beam and injection
|
1030-1430
|
Linac PEM testing.
|
Sereno Borland Pasky
|
Occasional injection
|
1030-1400
|
Beam steering with 14ID user. Parasitic to Linca PEM testing.
|
Decker Singh FC
|
Stored beam
|
1030-1400
|
BM/ID xbpm alignment. Parasitic to everything.
|
Hahne
|
Stored beam
|
1430-1700
|
PAR bunch cleaning testing.
|
Sereno Borland
|
Occasional injection
|
1400-1700
|
Timing scan and 35ID offsets. Parasitic to PAR bunch cleaning.
|
Singh Decker
|
Stored beam
|
1700-2000
|
Investigate/verify IOC reboot and cogging procedures.
|
Banks
|
Stored beam and injection
|
1700-1900
|
PAR operator training. Parasitic to procedures verifications.
|
Shumard
|
|
2000-2400
|
Response matrix measurements for lattice correction and bpm gain measurements. Lattice adjustment for 112 mA operation.
|
Sajaev
|
Stored beam and injection
|
|
Tuesday, 10/28/03
|
|
|
0000-0400
|
SR beam history injection transient measurements.
|
Sereno
|
Stored beam and injection
|
0400-0800
|
SR beam dynamics with horizontal and phase kicks.
|
Harkay Guo
|
Stored beam and injection
|
0800-1400
|
PTB S-band bpm testing and direct injection.
|
Sereno
|
No SR beam
|
0800-1100
|
Test new DBPLD database software in iocs1bpm and iocs9bpm. Parasitic to PTB bpm testing.
|
Pietryla Lenkszus
|
No SR beam
|
1100-1200
|
Test VP ioc and RTFB ioc reboot. Parasitic to PTB testing.
|
Yao
|
No SR beam
|
1400-1600
|
OPS training.
|
Weyer
|
Stored beam and injection
|
1600-2000
|
BPM gain installation.
|
Emery Shang Sajaev
|
Stored beam and injection
|
2000-2400
|
Orbit and DBPLD tests after gain installation.
|
Singh Erwin
|
Stored beam and injection
|
2300-0100
|
Linac operator training. Parasitic to orbit tests.
|
Klymowych
|
|
|
Wednesday, 10/29/03
|
|
|
0100-0600
|
Booster vertical injection controllaw studies.
|
Sereno
|
No SR beam
|
0600-0700
|
Response matrix measurements for gain verification.
|
Sajaev
|
Stored beam and injection
|
0700-0800
|
Prepare for user run. Topup, 110mA, 24 singlets, cogging.
|
OPS
|
Stored beam and injection
|