Machine Studies

Schedule for Run3-6,2003

November 3rd, 1600 - November 4th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 11/03/03

 

 

1600-1610

Record user orbit .

Singh

SR beam

1610-1700

Feedback IOCs work in sectors 29, 31 and 33.

Gold

No SR beam

1700-2100

Test X-ray bpms in RTFB.

Emery

Stored beam and injection

1600-2100

Booster vertical injection controllaw and injection PEM testing. Parasitic to IOC and X-ray bpms.

Sereno

 

2100-2300

BTS characterization.

Emery

Injection

 

Tuesday, 11/04/03

 

 

2300-0200

Lifetime and dynamic aperture characterization with increased S2.

Sajaev

Stored beam and injection

0200-0400

OPS training.

OPS

 

0400-0700

ID xbpm work.

Singh Decker

Stored beam and injection

0600-0700

Switch pumps in linac gallery. Parasitic to xbpm work.

Ferry

 

0700-0800

Prepare for user beam, lower emittance, top-up, 24 singlets with cogging.

OPS

Stored beam and injection