Machine Studies

Schedule for Run3-7, 2003

November 10th, 0800 - November 12th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 11/10/03

 

 

0800-0815

Record XBPM data for user orbit

OPS

SR Beam

0815-0915

Calibrate L5:CM1

Brill

No beam

0815-0915

Swap VXI Module at ioclid4 & Lid5

Grelick

No injection

0815-0900

Reboot iocbvp1 to added PVs

Varotto

No injection

0815-0900

Change stringout PVs to waveform PVs on iocruncontrol

Lenkszus

No beam

0815-0915

Replace Allen/Bradley 1771-IFE module

Di Monte

No beam

0815-0915

Switch from RF3 to RF2 providing

Nassiri

No beam

0815-1000

Install & test card in iocinjtime to support PAR Bunch Cleaning

Lenkszus

No injection

0815-1000

FE-EPS testing at 9ID, vacuumm system verification

Behrndt

No beam

0815-1000

Replace Dosimeters at 3ID & 4ID under a Working Warm procedure

Petra

Zone A Controlled Access

0815-1000

Inspect SR Dipole regulator

McNamara

No beam

0815-1000

Check S36 cavity 1 coupler thermocouple. Possible access zone F.

RF

No beam

1000-1030

Recover the Linac, Booster & SR equipment and store beam in the Ring

OPS

Recovery

1030-1100

Test power cycling of PV ioc procedure

Yao Fors

Stored beam and injection

1100-1500

Investigate BPM noise.

Lenkszus Laird Erwin Hahne Xiang

Stored beam and injection

1200-1400

Linac training. Parasitic to BPM noise.

OPS

 

1500-1900

Dynamics study with horizontal and longitudinal excitation.

Harkay Guo

Stored beam and injection

1900-2400

324 bunch mode bpm database.

Singh Decker

Stored beam and injection

1900-2100

Linac training. Parasitic to bpm database.

OPS

 

2300-0100

Par training. Parasitic to bpm database.

OPS

 

 

Tuesday, 11/11/03

 

 

0000-0400

Linear coupling and instability study.

Wang

Stored beam and injection

0400-1000

Dynamic aperture measurement. BPM gain measurement. Lattice adjustment for 324 bunches.

Sajaev

Stored beam and injection

0700-0900

Linac training. Parasitic

OPS

 

1000-1400

Test new version of steering software.

Emery Shang OPS

Stored beam and injection

1000-1300

Investigate removal of multiple ferrites in L1. Parasitic to steering software.

Grelick

 

1400-1500

ST power supply PEM testing.

Soliday Borland

Stored beam and injection

1500-2300

ID Xbpm feedforward.

Singh Decker

Stored beam and injection

1500-1700

Linac training.

OPS

 

 

Wednesday, 11/12/03

 

 

2300-0300

Check routine CPU operation.

Emery

Stored beam and injection

2300-0100

Par training. Parasitic to CPU studies.

OPS

 

0300-0700

Multibunch transverse instability studies.

Harkay

Stored beam and injection

0700-0800

Ready for 0+324X1 fill pattern, low emittance, non-TopUp.

OPS

 

Stored beam and injection