Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Friday, 01/23/04
|
|
|
0800-1600
|
New septa, kicker characterization, lattice setup and initial beam store
|
Yao
Borland
|
Stored beam and injection
|
1400-1600
|
Linac/Booster training
|
Jones
|
Stored beam and injection
|
1600-2400
|
BPM polarity/coupling test/timing scan
|
Decker
Singh
Erwin
|
Stored beam and injection
|
|
Saturday, 01/24/04
|
|
|
0000-0800
|
BPM offsets with 102mA beam
|
Ops
Diag
|
Stored beam and injection
|
0800-1000
|
Initial setup of S35 pinhole camera
|
Yang
|
Stored beam and injection
|
1000-1400
|
Gun2 checkout with new (original) PFN cable installed, no SR injection
|
Lewellen
|
No injection
|
1400-1600
|
initial commissioning & checkout, direct injection BPMs
|
Lewellen
|
No injection
|
1600-1800
|
Response matrix measurement & operational testing,
|
Lewellen
|
Injection possible
|
1800-2400
|
New kicker chamber bellows temperature study
|
Harkay
|
Stored beam and injection
|
|
Sunday, 01/25/04
|
|
|
0000-0400
|
Longitudinal dynamics
|
Harkay
Guo
|
Stored beam and injection
|
0400-0800
|
SR steering software test
|
Borland
|
Stored beam and injection
|
0800-1400
|
Install BPM offsets
|
Singh
|
Stored beam and injection
|
1400-2000
|
BPLD validation
|
Pietryla
|
Stored beam and injection
|
2000-2200
|
Re-verify trajectory & steering, whole linac but focusing on L2
|
Lewellen
|
Injection possible
|
2200-2400
|
PCgun high-charge operation and use as SR injector
|
Lewellen
|
Injection possible
|
|
Monday, 01/26/04
|
|
|
0000-0400
|
PCgun high-charge operation and use as SR injector
|
Lewellen
|
Injection possible
|
0400-0600
|
Studies time available
|
|
Stored beam and injection
|
0600-0900
|
bpm gain measurement
|
Yao
Sun
|
Stored beam and injection
|
0900-1200
|
nbBPM low current injection
|
Yao
Pietryla
|
Stored beam and injection
|
1200-1400
|
Linac/Booster training
|
Jones
|
Stored beam and injection
|
1400-1600
|
SR training
|
Schroeder
|
Stored beam and injection
|
1600-1700
|
Software test of PEM warning
|
Shultes
Soliday
|
Stored beam and injection
|
1600-2400
|
Zone-A access to repair 1ID frond-end fixed mask
|
Vac group
|
No beam
|
1700-1800
|
Validate RTFB, VP, BPM ioc reboot
|
OPS
|
Stored beam and injection
|
1800-2400
|
Initial commissioning, checkout, and response matrix measurement of booster bypass BPMs
|
Lewellen
|
SR injection possible (second half)
|
|
Tuesday, 01/27/04
|
|
|
0000-2400
|
Zone-A access to repair 1ID frond-end fixed mask
|
Vac group
|
No beam
|
0000-0800
|
|
|
No beam
|
0800-1000
|
Zone-F access to inspect IK blower
|
Morrison
|
No beam
|
0800-1000
|
Zone-F access to inspect thermal couplers
|
Jaski
|
No beam
|
1200-1600
|
RF3 drives booster test and validation after test.
|
Cherbak
RF group
|
No beam
|
|
Wednesday, 01/28/04
|
|
|
0000-0900
|
Zone-A access to repair 1ID frond-end fixed mask
|
Vac group
|
No beam
|
0800-1000
|
Booster IK test
|
Hillman
Deriy
|
No beam
|
0800-1000
|
SR operator training
|
Schroeder
|
Stored beam and injection
|
0800-1000
|
Linac/Booster training
|
Jones
|
Stored beam and injection
|
1000-1800
|
Orbit recovery
|
Singh
Decker
|
Stored beam and injection
|
1000-1800
|
xBPM tests (Parasitic)
|
Hahne
|
Stored beam and injection
|
1800-2200
|
Datapool orbit correction testing
|
Borland
Yao
|
Stored beam and injection
|
2200-2400
|
xBPM feedforward
|
Decker
Singh
|
Stored beam and injection
|
|
Thursday, 01/29/04
|
|
|
0000-0400
|
xBPM feedforward
|
Decker
Singh
|
Stored beam and injection
|
0400-0700
|
Injection, lifetime tuneup
|
Yao
Harkay
Borland
|
Stored beam and injection
|
0700-0800
|
Ready user beam with low emittance, 1x324 fill pattern and non-topup
|
Yao
OPS
|
Stored beam and injection
|