Machine Studies

Schedule for Run1-1,2004

Jan. 23 0800 to Jan. 29 0800

 

Time

Descriptions

Studiers

SRStatus

 

Friday, 01/23/04

 

 

0800-1600

New septa, kicker characterization, lattice setup and initial beam store

Yao

Borland

 

Stored beam and injection

1400-1600

Linac/Booster training

Jones

Stored beam and injection

1600-2400

BPM polarity/coupling test/timing scan

Decker

Singh

Erwin

Stored beam and injection

 

Saturday, 01/24/04

 

 

0000-0800

BPM offsets with 102mA beam

Ops

Diag

Stored beam and injection

0800-1000

Initial setup of S35 pinhole camera

Yang

Stored beam and injection

1000-1400

Gun2 checkout with new (original) PFN cable installed, no SR injection

Lewellen

No injection

1400-1600

initial commissioning & checkout, direct injection BPMs

Lewellen

No injection

1600-1800

Response matrix measurement & operational testing,

Lewellen

Injection possible

1800-2400

New kicker chamber bellows temperature study

Harkay

Stored beam and injection

 

Sunday, 01/25/04

 

 

0000-0400

Longitudinal dynamics

Harkay

Guo

Stored beam and injection

0400-0800

SR steering software test

Borland

Stored beam and injection

0800-1400

Install BPM offsets

Singh

Stored beam and injection

1400-2000

BPLD validation

Pietryla

Stored beam and injection

2000-2200

Re-verify trajectory & steering, whole linac but focusing on L2

Lewellen

Injection possible

2200-2400

PCgun high-charge operation and use as SR injector

Lewellen

Injection possible

 

Monday, 01/26/04

 

 

0000-0400

PCgun high-charge operation and use as SR injector

Lewellen

Injection possible

0400-0600

Studies time available

 

Stored beam and injection

0600-0900

bpm gain measurement

Yao

Sun

Stored beam and injection

0900-1200

nbBPM low current injection

Yao

Pietryla

Stored beam and injection

1200-1400

Linac/Booster training

Jones

Stored beam and injection

1400-1600

SR training

Schroeder

Stored beam and injection

1600-1700

Software test of PEM warning

Shultes

Soliday

Stored beam and injection

1600-2400

Zone-A access to repair 1ID frond-end fixed mask

Vac group

No beam

1700-1800

Validate RTFB, VP, BPM ioc reboot

OPS

Stored beam and injection

1800-2400

Initial commissioning, checkout, and response matrix measurement of booster bypass BPMs

Lewellen

SR injection possible (second half)

 

Tuesday, 01/27/04

 

 

0000-2400

Zone-A access to repair 1ID frond-end fixed mask

Vac group

No beam

0000-0800

 

 

No beam

0800-1000

Zone-F access to inspect IK blower

Morrison

 

No beam

0800-1000

Zone-F access to inspect thermal couplers

Jaski

No beam

1200-1600

RF3 drives booster test and validation after test.

Cherbak

RF group

No beam

 

Wednesday, 01/28/04

 

 

0000-0900

Zone-A access to repair 1ID frond-end fixed mask

Vac group

No beam

0800-1000

Booster IK test

Hillman

Deriy

No beam

0800-1000

SR operator training

Schroeder

Stored beam and injection

0800-1000

Linac/Booster training

Jones

Stored beam and injection

1000-1800

Orbit recovery

Singh

Decker

Stored beam and injection

1000-1800

xBPM tests (Parasitic)

Hahne

Stored beam and injection

1800-2200

Datapool orbit correction testing

Borland

Yao

Stored beam and injection

2200-2400

xBPM feedforward

Decker

Singh

Stored beam and injection

 

Thursday, 01/29/04

 

 

0000-0400

xBPM feedforward

Decker

Singh

Stored beam and injection

0400-0700

Injection, lifetime tuneup

Yao

Harkay

Borland

Stored beam and injection

0700-0800

Ready user beam with low emittance, 1x324 fill pattern and non-topup

Yao

OPS

Stored beam and injection