Machine Studies

Schedule for Run01-10, 2004

March 30th, 0800 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 3/30/04

 

 

0800-0815

Record XBPM data for user orbit with TopUp running

OPS

Stored beam and injection

0815-1015

Investigate S15/16 P1 BPM problem

Singh

Diag Group

Stored beam and injection

1015-1100

Measure P1/P0 offsets

Singh

Diag Group

Stored beam and injection

1015-1100

Switch ID14 DBPLD from P1s to P0s ( from 14BP1/15AP1 to 14BP0/15AP0)

Singh

Lenkszus

Stored beam and injection

1100-1200

Validate DBPLDs in 14ID

Pietryla

Stored beam and injection

1100-1200

Fill the 2" water header for beamline 17

(possibility of dumping once)

Ferry

Stored beam and injection

1100-1200

Investigate bit-bus comm. problem at S15. (possibility of dumping beam once)

Varotto

Stored beam and injection

1000-1200

Linac Operator training

Glenn

Grodecki

Injection possible

1200-1400

Software test

Emery

Stored beam and injection

1200-1300

Restore user gap script test

Yao

Shang

Stored beam and injection

1400-1530

Response matrix measurement for scraper lattice

Yao

Stored beam and injection

1530-1600

Ready for 0+24X1 fill pattern, low emittance, TopUp

OPS

Stored beam and injection