Machine Studies

Schedule for Run01-12, 2004

April 12th, 1600 - April 13th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 4/12/04

 

 

1600-1615

Record XBPM data for user orbit with TopUp running

OPS

SR Beam

1615-1715

CPU software testing

M. Smith

Emery

No beam

1615-1715

Replace bitbus board (Pep) in iocs1vp (work to be performed during no-beam intervention Monday 4/12)

Varotto

No beam

1615-1715

Replace S14BP4 SCDU

Erwin

No beam

1615-1715

Replace NbBPM chassis for 15AP1,15BP1,16AP1,and 16BP1. Lester Erwin, Chuck

Gold, Tim Roberts, and Hanh Bui.

Erwin

Gold

Roberts

Bui

No beam

1615-1715

Replace a failing fan assembly in the feedback IOC chassis in sector 19-04 cabinet and to replace a bad rack blower in sector 18-04 cabinet.

Gold

No beam

1715-1815

SROrbitControllaw software testing.

Emery

Shang

Stored beam and injection

1815-1900

BPM offset measurement for 15ID bpms

Singh

Stored beam and injection

1900-2000

BPLD module replacement and validation on 15ID.

Pietryla

Stored beam and injection

2000-2400

Beam dump patterns vs scraper and bump in ID3/ID4

Borland

Stored beam and injection

 

Tuesday, 4/13/04

 

 

0000-0300

Neutron rates vs bump in ID3 and fill pattern.

Borland

Stored beam and injection

0300-0500

CPU measurement

Emery

Stored beam and injection

0500-0700

324 bunch orbit restore

Singh

Stored beam and injection

0700-0800

Ready for 0+324X1 fill pattern, low emittance, non-TopUp

OPS

Stored beam and injection