Machine Studies

Schedule for Run01-13, 2004

April 20th, 0000 - April 20th, 2400

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 4/20/04

 

 

0000-0015

Record XBPM data for user orbit

OPS

SR beam

0015-0300

Injection study using new BTS flag

Emery

Stored Beam & Inj

0300-0700

Measure spectrum of HOM modes of RF cavities (parasitic)

Emery

Stored Beam & Inj

0300-0700

ID3/ID4 radiation level study with bump at 35ID, 24 bunch fill pattern

Borland

Emery

Stored Beam & Inj

0700-0900

Controlled Access to unlock the 23ID shutters

Ramanathan

CA Mode Zone D

0700-0900

EMW supply test

Deriy

PS group

No Beam

0700-0900

PAR Operator console test

Forth

No Inj

0900-1300

Shielding validation 23ID

Ramanathan

Stored Beam & Inj

1300-1600

Xray bpm study on 22ID beamline, shutters support required

Decker

Stored Beam & Inj

1600-1800

Booster direct injection with 1296 bunches

Decker

 

Stored Beam & Inj

1800-2000

SR re-qualification

Keyser

Stored Beam & Inj

2000-2359

SR thermal imaging, no stored beam and no accesses. Must be able to run the supplies at elevated levels.

McNamara

No Beam

2400

Shutdown all Linac, PAR, Booster & Storage Ring equipment

OPS

Shutdown