Monday, 2/9/04
|
|
|
0800-0815
|
Record XBPM data for user orbit
|
OPS
|
SR Beam
|
0815-2400
|
Replace 1ID Fixed Mask
|
J. Gagliano
|
Zone-A
AA Mode
|
0830-0930
|
Install RMS motion diagnostics software on iocs40fb
|
F. Lenkszus
|
No Beam
|
0830-1230
|
Investigate EMW PS overcurrent trips; need to move gaps in Zone-B
|
B. Deriy
|
|
0900-1300
|
Repair RG2 Kicker
|
A. Hillman
|
Linac
Controlled Access
|
0900-1100
|
Redress cables at L2 DMU cabinet
|
Grelick/Yoder
|
|
0900-1100
|
Plug RG1 & RG2 Heater PSs into normal AC power.
|
A. Hillman
|
|
0900-1100
|
Install Diodes on P:SD & P:Q4 PSs
|
R. Seglem
|
|
0900-1200
|
Replace 3ID & 4ID Dosimeters
|
M. Petra
|
Zone-A
AA Mode
|
0900-1000
|
Reboot iocleutl1 & iocbsynclight
|
J. Stevens
|
|
0930-1730
|
Replace 2 linear stages for new S35 pinhole slits
|
BingXin Yang
|
Zone-E
AA Mode
|
0930-1430
|
Check cylinder operation 34ID PS1 & PS2
|
J. Gagliano
|
Zone-E
AA Mode
|
0930-1330
|
Investigate S24C:BM Klixon problem
|
P. McNamara
|
Zone-D
AA Mode
|
0930-1030
|
Check interlock equipment locations and spacing at 23ID front end. No components will be disconnected.
|
J. Forrestal
|
Zone-D
AA Mode
|
1000-1200
|
Check coax pins @ 17BM P2 Xbpm check repair potentiometer @ 18ID P1 Xbpm
|
M. Hahne
|
Zone C
AA Mode
|
1000-1100
|
Remove experiment from Booster tunnel
|
Kevin Dolan/OPS
|
Booster
Controlled Access
|
1000-1100
|
Reboot iocbvp1, iocbvp3 & iocrfgun
|
M. Varotto
|
|
1000-1100
|
Install VME bus analyzer in iocs25fb which will be power cycled.
|
F. Lenkszus
|
|
1100-1200
|
Verify Thermocouples at S:IK2 & S:IK3
|
C. Putnam
|
Controlled Access F
|
1100-1200
|
Adjust illumination control BTS flag #6
|
B. Berg
|
Controlled Access F
|
1100-1200
|
Check 40AP4 button, cables and matching networks, using network analyzer.
|
L. Erwin
|
Controlled Access F
|
1230-1630
|
Testing and optimization of RF2's regulation system
|
Nassiri/Trento
|
No Beam
|
1300-1500
|
Validate RG2 Kicker
|
Pasky/Lewellen
|
|
1500-1700
|
Linac tuning
|
Pasky/Lewellen
|
|
1700-2400
|
Booster direct injection controlLaw studies
|
N. Sereno
|
|
|
Tuesday, 2/10/04
|
|
|
0000-2400
|
Replace 1ID Fixed Mask
|
J. Gagliano
|
Zone-A
AA Mode
|
0000-0100
|
Booster direct injection controlLaw studies
|
N. Sereno
|
|
0100-0400
|
PAR Operator training
|
Klimowych
|
|
0700-0900
|
Linac Operator training
|
C. Forth
|
|
0700-1100
|
Investigate S23A:V2:PS readback problem
|
P. McNamara
|
No Beam
|
0900-1200
|
Testing and optimization of RF2's regulation system
|
Nassiri/Trento
|
No Beam
|
0900-1700
|
Linac & LEUTL PEM testing
|
M. Borland
|
|
1300-1430
|
Reposition SR IK2 vacuum chamber thermocouples. Remove 8 thermocouples and reposition the in the correct position
|
C. Putnam
|
Controlled Access F
|
1300-1430
|
Adjust illumination control BTS flag #6
|
B. Berg
|
Controlled Access F
|
|
Wednesday, 2/11/04
|
|
|
0000-0700
|
SR recovery and Lattice setup
|
Emery, Borland, Sajaev
|
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored beam and injection
|