Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 2/23/04
|
|
|
0800-0815
|
Record XBPM data for user orbit
|
OPS
|
SR Beam
|
0800-1000
|
Linac Operator console test
|
Klimowych
|
No Inj
|
0815-0915
|
Install AC line filters on VME crates for iocs23fb, iocs25fb, iocs27fb, iocs29fb. Each ioc will be power cycled.
|
Lenkszus
|
No Beam
|
0815-0830
|
ACIS test
|
OPS
|
No Beam
|
0900-2100
|
Modify and re-validate SR:F ACIS, requires SR Zones A, E & F to be in Authorized Access and Linac/PAR & Booster in Controlled Access. Will require that all Linac/PAR, Booster & SR:F ACIS equipment be shutdown validated following this work.
|
Forrestal
|
AA Mode
SR:A, E, F
No Beam
|
0900-1100
|
Investigate 23A:V1 Dac problem
|
McNamara
|
No Beam
|
0900-1100
|
Replace dosimeters in sectors 3 and 4
|
Petra
|
AA Mode Zone A
No Beam
|
0900-1100
|
Disconnect trims power supplies in sectors 14 & 26
|
McNamara
|
No Beam
|
0900-1100
|
Test S37C1 tuner bellows thermocouple and wiring, AA to Zone-F
|
Cherbak
|
No Beam
|
0900-1000
|
Repair small leak on fitting for filter differential pressure gauge on cooling skid p-vc-40.
|
Ferry
|
No beam
|
0900-1100
|
test SR software without beam.
|
Emery
Soliday
|
No beam
|
1000-1130
|
Work on iocbvp1 and iocbvp3 to troubleshoot DirectNet PLC installation. Reboot iocrfgun and iocpar02 to add countdown PVs for thyratron heaters.Verify jumper settings in bitbus boards, iocs1vp.
|
Varotto
|
No Beam
|
1000-1100
|
Reboot ioclet1bpm to add some PVs
|
Arnold
|
No Beam
|
1000-1200
|
Check Linac PS labeling to the correct breaker. this will require turning off supplies at the breaker.
|
Hillman
|
No Beam
|
1000-1400
|
Working Hot conditions to test and compare RG1 and RG2 kickers. Control access to linac.
|
Hillman
|
No Beam
|
1000-1200
|
Check L5RF FWD PWR readback cables
|
Grelick, Yoder
|
No Beam
|
1100-1300
|
Replace Gespac cables in S23 cab1
|
McNamara
|
No Beam
|
1330-1500
|
Replace the MPEOB strobe in S20. Zone C authorized access
|
McNamara
|
No Beam
|
1330-1430
|
2 Hours to check the Klixon readback for L1:RG2:SC2:HZ and VL. Controlled Access to linac
|
Hillman
|
No Beam
|
2100-2400
|
Fill the ring and test RTFB with additional MpBpms. Align S7ID xbpms (parasitic)
|
Singh
Hahne
|
Stored beam, no injection
|
2100-2400
|
Booster/PAR/linac PEM testing (no injection)
|
Sereno
Soliday
|
No injection
|
2100-2400
|
Measure/calibrate signals on all the PB
and BB bpms using RG2 beam
|
Lill
|
No injection
|
|
Tuesday, 2/24/04
|
|
|
0000-0200
|
Booster/PAR/linac PEM testing (no injection)
|
Sereno
|
No injection
|
0000-0200
|
Measure/calibrate signals on all the PB
and BB bpms using RG2 beam
|
Lill
|
No injection
|
0200-0500
|
direct injection controllaw testing. Injectors will not be available during these
tests.
|
Sereno
|
No injection
|
0500-0900
|
Test of ID8 customized beta functions
|
Sajaev
|
Stored beam and injection
|
0900-1200
|
SR re-qualification (injection available after 1100)
|
Schroeder
|
Stored beam and injection
|
0900-1100
|
Commission and validate the new LTP BESOCM
|
Pietryla, Forrestal
|
No injection
|
1100-1200
|
Testing of upgraded SCR (Parasitic)
|
Borland
|
Stored beam and injection
|
1200-1600
|
Continuation of energy aperture studies
|
Borland
|
Stored beam and injection
|
1600-2000
|
Replace nbBpms module (S8A:P1,S35A:P1), collect DSPScope data
|
Singh
Bui
Erwin
|
Stored beam and injection
|
1800-2000
|
Linac/PAR training
|
Forth
|
Stored beam and injection
|
2000-2400
|
Gun#1 kicker validation (injection possible)
|
Lewellen
|
Stored beam, injection possible
|
2000-2400
|
ID xbpm feedforward
|
Decker
Singh
|
Stored beam, injection possible
|
|
Wednesday, 2/25/04
|
|
|
0000-0100
|
Gun#1 kicker validation (injection possible)
|
Lewellen
|
Stored beam, injection possible
|
0000-0100
|
ID xbpm feedforward
|
Decker
Singh
|
Stored beam, injection possible
|
0100-0300
|
Booster training
|
Shumard
|
Stored beam and injection
|
0100-0400
|
Investigate vertical driving source.
|
Harkay
|
Stored beam and injection
|
0400-0700
|
Test BPM history modules. Test beam history module resynch. (Harkay, Lenkszus)
|
Pietryla
Lenkszus
Harkay
|
Stored beam and injection
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored beam and injection
|