Monday, 3/8/04
|
|
|
0800-0815
|
Fill back to 102mA and record XBPM data for user orbit
|
OPS
|
SR Beam
|
0805-1000
|
Change circuit on PSD to avoid tripping on restarts
|
Hillman
|
No injection
|
0805-0900
|
Test breaker for BBV2 that had tripped at TRP-J12-22; Other supplies in the panel will need to be turned off if replacement is needed.
|
Markovich
|
No injection
|
0820-0900
|
Remove the wires to the PLC inputs that allow stand alone operation of the RF Test Room in 420
|
Forrestal
|
No impact
|
0820-1015
|
To replace the following meters: S36C1 Tuner Body, S36C1 Tuner Piston, S36C2 Tuner Piston, S37C3 Tuner Bellows, S40C3 Tuner Piston
|
Cherbak
|
No Beam
|
0820-1015
|
Check out HOM mode signal mux circuit
|
Horan
Yao
|
No Beam
|
0830-0900
|
Reboot iocpar02, iocbvp1 and iocbvp3 to load thyratron heater time
countdown and flowmeter pvs
|
Varotto
|
No injection
|
0900-1100
|
Linac qualification test
|
Forth
|
No injection
|
1015-1200
|
SR training
|
Shumard
|
Stored beam and injection
|
1200-1800
|
Energy aperture study
|
Borland
|
Stored beam and injection
|
1800-2300
|
ID8 customized beta test with the user. Need
floor coordinator support to open shutter.
|
Sajaev
8ID user
|
Stored beam and injection
|
2300-2400
|
Apply new bpm gains.
|
Sajaev
|
Stored beam and injection
|
|
Tuesday, 3/9/04
|
|
|
0000-0100
|
Apply new bpm gains.
|
Sajaev
|
Stored beam and injection
|
0100-0300
|
SR training
|
Sutton
|
Stored beam and injection
|
0300-0600
|
Correction of CPU in linear mode
|
Emery
|
Stored beam and injection
|
0600-0800
|
Corrector noise study
|
Fors
Emery
|
Stored beam, and injection
|
0800-0900
|
Reboot VP iocs to change skew degausing procecure and parameter
|
Emery
Varotto
|
no beam
|
0800-1000
|
Commission and validate the new LTP BESOCM
|
Pietryla
Forrestal
|
No injection
|
1000-1100
|
Investigate gap open function at beam loss
|
Yao
M. Smith
|
Stored beam and injection
|
1100-1300
|
Linac training
|
Glenn
|
Injection possible
|
1100-1500
|
Longitudinal beam dynamics study (parasittic, injection possible)
|
Guo
C. Wang
J. Albert
|
Stored beam, Injection possible
|
1300-1500
|
Linac training
|
Grodeski
|
Injection possible
|
1500-1600
|
Setup 24 pattern
|
Yao
Sajaev
|
Stored beam and injection
|
1600-2000
|
Recover orbit for 24 bunch
|
Singh
|
Stored beam and injection
|
2000-2400
|
Canted undulator X-bpm studies
|
Decker
|
Stored beam and injection
|
|
Wednesday, 3/10/04
|
|
|
0000-0300
|
Canted undulator X-bpm studies
|
Decker
|
Stored beam and injection
|
0300-0700
|
NbBpm test with RTFB
|
Singh
Bui
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|