Machine Studies

Schedule for Run01-7, 2004

March 8th, 0800 - March 10th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 3/8/04

 

 

0800-0815

Fill back to 102mA and record XBPM data for user orbit

OPS

SR Beam

0805-1000

Change circuit on PSD to avoid tripping on restarts

Hillman

No injection

0805-0900

Test breaker for BBV2 that had tripped at TRP-J12-22; Other supplies in the panel will need to be turned off if replacement is needed.

Markovich

No injection

0820-0900

Remove the wires to the PLC inputs that allow stand alone operation of the RF Test Room in 420

Forrestal

No impact

0820-1015

To replace the following meters: S36C1 Tuner Body, S36C1 Tuner Piston, S36C2 Tuner Piston, S37C3 Tuner Bellows, S40C3 Tuner Piston

Cherbak

No Beam

0820-1015

Check out HOM mode signal mux circuit

Horan

Yao

No Beam

0830-0900

Reboot iocpar02, iocbvp1 and iocbvp3 to load thyratron heater time

countdown and flowmeter pvs

Varotto

No injection

0900-1100

Linac qualification test

Forth

No injection

1015-1200

SR training

Shumard

Stored beam and injection

1200-1800

Energy aperture study

Borland

Stored beam and injection

1800-2300

ID8 customized beta test with the user. Need

floor coordinator support to open shutter.

Sajaev

8ID user

Stored beam and injection

2300-2400

Apply new bpm gains.

Sajaev

Stored beam and injection

 

Tuesday, 3/9/04

 

 

0000-0100

Apply new bpm gains.

Sajaev

Stored beam and injection

0100-0300

SR training

Sutton

Stored beam and injection

0300-0600

Correction of CPU in linear mode

Emery

Stored beam and injection

0600-0800

Corrector noise study

Fors

Emery

Stored beam, and injection

0800-0900

Reboot VP iocs to change skew degausing procecure and parameter

Emery

Varotto

no beam

0800-1000

Commission and validate the new LTP BESOCM

Pietryla
Forrestal

No injection

1000-1100

Investigate gap open function at beam loss

Yao

M. Smith

Stored beam and injection

1100-1300

Linac training

Glenn

Injection possible

1100-1500

Longitudinal beam dynamics study (parasittic, injection possible)

Guo

C. Wang

J. Albert

 

Stored beam, Injection possible

1300-1500

Linac training

Grodeski

Injection possible

1500-1600

Setup 24 pattern

Yao

Sajaev

Stored beam and injection

1600-2000

Recover orbit for 24 bunch

Singh

Stored beam and injection

2000-2400

Canted undulator X-bpm studies

Decker

Stored beam and injection

 

Wednesday, 3/10/04

 

 

0000-0300

Canted undulator X-bpm studies

Decker

Stored beam and injection

0300-0700

NbBpm test with RTFB

Singh

Bui

Emery

Stored beam and injection

0700-0800

Ready for 0+24X1 fill pattern, low emittance, TopUp

OPS

Stored beam and injection