Machine Studies

Schedule for Run01-9, 2004

March 22nd, 0800 - March 24th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 3/22/04

 

 

0800-0815

Record XBPM data for user orbit with TopUp running

OPS

Stored Beam and injection

0830-1130

Install the ACIS RF3/RF5 Interface chassis; requires Booster & Zone F ACIS in CA Mode. RF3 & RF5 will need to be shutdown validated

Hogrefe

No Beam

0830-0930

S15A:P1 bpm cable test

Erwin

Brill

No Beam

0830-0900

Replace Pep board on iocs15vp

Varotto

No Beam

0830-0930

Hook up an oscilloscope to backplane signals at ioc25fb

Laird

No Beam

0830-1000

Replace dosimeters along the IDs in S3&4

Petra

CA Mode Zone A

0830-1030

Change circuit on P:SD to avoid tripping on restarts

Hillman

No beam

0830-1030

Update and test the interleaving PS front panel firmware LTP:B1, PTB:B1 & 2

Deriy

Fors

No Beam

0830-1130

Replace pressure switch and solenoid valve on Klystron Gallery pump system; Switch back to P-PR-KLY

Swetin

No Beam

0930-1030

Check water leak at S14A:S2

Ferry

CA Mode Zone B

1000-1100

Test ID restore reference gap pem

Shang

Yao

No Beam

1130-1330

Prepare lattice for study with 8ID users.

Sajaev

Stored beam and injection

1330-1430

SR training

Christensen

Stored beam and injection

1400-1600

Linac training (parasitic)

Jones

Stored beam and injection

1400-1500

Software test

Shang

Emery

No injection

1500-2000

ID8 customized beta test with the user. Need floor coordinator support to open shutter.

Sajaev
8ID user

Stored beam and injection

2000-2400

Commissioning booster bypass controllaw

Sereno

No injection

2000-2300

CPU measurement (parasitic, require stored beam)

Emery

No injection

 

Tuesday, 3/23/04

 

 

0000-0400

Commission booster direct injection controllaw

Sereno

No injection

0400-0600

SR training

Kaiser

No injection

0600-0800

Investigate the problems with the SR DCPS turn on command / scripts

Fors Varotto

No Beam

0600-0800

Test & Investigate 2BH1 trip Zone A

McNamara

No Beam

0600-0800

Check Linac PS labeling on the PS's to the correct breaker

Hillman

No Beam

0600-0800

Test SR standardize pem, needs to turn on BM and multipole of some sectors.

Soliday

No Beam

0800-0915

Test BIK, BEK kicker reset sequence
(Linac Operator training)

Varotto, Hillman

No injection

0800-0930

Access to Zone D to unlock 24ID shutters, and perform shutter test.

Ramanathan

Hawkins

CA Mode Zone D

0800-0930

Replace rad.mon. A-Gate.

Vacca

CA Mode Zone F

0930-1330

Shielding verification for 24-ID B; 10mA then 30mA

Ramanathan

Stored beam and injection

0930-1230

Linac Operator training (parasitic)

Jones

Stored beam and injection

1330-1430

Access Zone D to lock 24ID shutters

Ramanathan

CA Mode Zone D

1430-1630

SR training

Shumard

Stored beam and injection

1630-1830

Testing of upgraded SCR

Borland

Shang

Stored beam and injection

1830-2400

Comparison of cerenkov readings for multiple lattices vs scraper

position.

Borland

Stored beam and injection

 

Wednesday, 3/24/04

 

 

0000-0400

NBbpm rtfb test

Emery

Singh

Erwin

Bui

Stored beam and injection

0400-0700

ID Xbpm feedforward

Singh

Stored beam and injection

0700-0800

Ready for 0+24X1 fill pattern, low emittance, TopUp

OPS

Stored beam and injection