Monday, 8/2/04
|
|
|
0800-0805
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
SR Beam
|
0805-0900
|
Replace blower unit in Rack 05-03
|
Benes
|
No Beam
|
0805-0930
|
Install software modifications for testing on iocs39fb & iocs29fb. The modification adds checksums to bpm data transferred from the DAS DSP to the Vertical DSP
|
Lenkszus
|
No Beam
|
0805-0930
|
Replace BUG communicating with Ion Gauge controller in S34
|
Stein
|
No Beam
|
0805-0930
|
replace a VME board in iocfe01
|
M. Smith
|
No Impact
|
0805-1000
|
Reboot iocrf3cav to install software for the HOM Damper Interlock monitoring system.
|
Dimonte
|
No Beam
|
0805-1000
|
De-energize panel board ELP-J1
|
Gibson
|
No impact
|
0805-1100
|
PAR bunch cleaning setup test
|
Yao, Grelick, Lenkszus
|
No impact
|
0805-1200
|
Access Zone B to test or replace 16ID SS2 open switch
|
Friedman
|
Access SR
Zone B
|
0830-1030
|
Operator Training - Booster
|
Forth
|
No Beam
|
0830-1000
|
replace dosimeters @3ID & 4ID. The ID gaps need to be open
|
Petra
|
Access SR Zone A
|
0830-1030
|
Check the status of a servo motor inserted near the sector 3 ID
|
Stein
|
Access SR Zone A
|
0830-0930
|
13IDP1X bpm translation stage is on limit switch, correct this problem
|
Hahne
|
Access SR
Zone B
|
0830-1030
|
Swap out up to 8 corrector PSs, this is an upgrade to the regulator circuit. (Zone C)
|
Vargus, Sprau
|
No Beam
|
0930-1030
|
17IDP2Y bpm translation stage is on limit switch, correct this problem
|
Hahne
|
Access SR Zone C
|
0930-1030
|
Replace magnet suppy at RF4
|
Waldschmidt
|
No impact
|
0930-1000
|
reboot iocsbpmdp to add 2 new PVs
|
Lenkszus
|
No Beam
|
1200-1230
|
Recover SR equipment & verify SR injection
|
OPS
|
Stored Beam &Inj
|
1230-2000
|
Xbpm alignment work
|
Decker
|
Stored Beam &Inj
|
1230-1330
|
Install modified xbpm filter cards in S5/6
|
Hahne
Singh
|
Stored Beam &Inj
|
1800-2000
|
Operator Training - PAR (1500-2300)
|
Glenn
|
Limited Inj
|
2000-2400
|
Image the multibunch bursting instability
|
Harkay
|
Stored beam & inj
|
|
Tuesday, 8/3/04
|
|
|
0000-0200
|
Operator Training - Linac (2300-0700)
|
Leeson
|
Limited Inj
|
0200-0700
|
Study time available
|
|
Limited Inj
|
0700-0900
|
Operator Qualification - Booster (0700-1500)
|
Forth, Jones
|
No Inj
|
0800-0900
|
Test SCR restore tracking. Needs to use LEUTL (without beam)
|
Borland
Shang
|
No Inj
|
0900-1100
|
Test despiking reramp software
|
Borland
Soliday
Shang
Lenkszus
|
Stored beam & inj
|
0900-1100
|
PAR training for RF group (injection possible)
|
Grelick
|
Stored beam & inj
|
1100-1400
|
Test PAR bunch cleaning with RF harmonic drive
|
Borland
Sereno
Yao
|
Stored beam & inj
|
1400-1800
|
Characterize P1 BPMs at low current
|
Bui
Singh
|
Stored beam & inj
|
1800-2100
|
S5/6 Xbpm/nbBpm spectrum measurement
|
Xiang
Bui
Singh
|
Stored beam & inj
|
1800-2100
|
S5/6 ID/BM Xbpms calibration (parasitic)
|
Hahne
|
Stored beam & inj
|
2100-2400
|
RTFB tests with xbpms/nbbpm
|
Singh
|
Stored beam & inj
|
2100-2300
|
Operator Training - PAR (1500-2300)
|
Glenn
|
Limited Inj
|
|
Wednesday, 8/4/04
|
|
|
0000-0200
|
Operator Training - Linac (2300-0700)
|
Leeson
|
Limited Inj
|
0200-0700
|
Studies time available
|
|
Stored beam & inj
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored beam and injection
|