Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 6/7/04
|
|
|
0800-0810
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
SR Beam
|
0810-1000
|
Operator Testing - Linac
|
Pasky
|
No beam
|
0810-0900
|
Reboot of iocbvp1, iocbvp3 & iocpar03
|
Varotto
|
No beam
|
0810-0910
|
Test new code out on the CPU insertion device
|
Marty Smith
|
No beam
|
0810-0930
|
Swap out Corrector power supplies in Zones C, D or E for Reg upgrade
|
McNamara
|
No beam
|
0810-0930
|
Upgrade power supply for MPEOB strobe
|
McNamara
|
No beam
|
0810-0930
|
Inspect the crowbar cabinets heater funnels at RF1, RF3, and RF5
|
Nassiri
|
No beam
|
0810-0930
|
Diagnose and repair S37 cav2 forward power readback
|
Cherbak
|
No beam
|
0810-0930
|
Prepare ID14 DBPLD and ID23 DBPLD for operation using P1 buttons
|
Pietryla
|
No beam
|
0810-1100
|
Validate newly instrumented interface between BLEPS and FEEPS at 10BM. FE shutter permit required close to 1100.
|
Friedman
|
No beam
|
0900-1000
|
Investigate instability in a Love Controller comminucation at 2BM.
|
Friedman
|
No beam
|
0810-1100
|
Replace UVCcomputer power supply cooling fans in RF5.
|
Trento
|
No beam
|
1100-1400
|
Punch down correctors and P1 setpoints and measure beta functions.
|
Emery Sajaev
|
Stored beam and injection
|
1400-1600
|
Characterize the NbBpm AGC response, validated the ID14 & ID23 DBPLDs.
|
Pietryla Bui
|
Stored beam and injection
|
1400-1600
|
Operator training - Linac. Parallel to DBPLD work.
|
Leeson, Jones
|
Limited Inj
|
1600-1900
|
Measure bpm offsets.
|
Singh Bui
|
Stored beam and injection
|
1600-1800
|
Operator training - Booster. Parallel to bpm offset measurements.
|
Forth
|
Limited Inj
|
1900-2400
|
Corect beta functions. Punch down correctors and P1 setpoints. Setup 8mA hybrid.
|
Emery Sajaev Harkay
|
Stored beam and injection
|
|
Tuesday, 6/8/04
|
|
|
0000-0700
|
BPM database for 8mA hybrid fill.
|
Singh
|
Stored beam and injection
|
0000-0200
|
Operator training - Linac. Parallel to canted undulator studies.
|
Grodecki
|
Limited Inj
|
0700-1000
|
Operator Testing - Linac.
|
Pasky
|
No injection
|
1000-1200
|
Investigate B:H3 changes after RTFB ioc reboot
|
Lenkszus Fors Yao
|
Stored beam and injection
|
1200-1500
|
Investigate bpm gain problem.
|
Lill Erwin
|
Stored beam and injection
|
1200-1400
|
Operator training - Linac. Parallel to bpm gain problem.
|
Leeson, Jones
|
Limited Inj
|
1500-1600
|
Software testing.
|
Emery
|
Stored beam and injection
|
1600-2000
|
Injector studies for high charge. Buch purity test.
|
Sereno, Pasky, Lumpkin
|
Stored beam and injection
|
2000-2400
|
Canted undulator feedforward.
|
Decker
|
Stored beam and injection
|
|
Wednesday, 6/9/04
|
|
|
0000-0400
|
Canted undulator feedforward (continued).
|
Decker
|
Stored beam and injection
|
0000-0200
|
Operator training - linac. Parallel to canted undulator feedforward.
|
Grodecki
|
Limited Inj
|
0400-0700
|
Available
|
|
Stored beam and injection
|
0700-0800
|
Ready for 1+8X7 fill pattern, low emittance, TopUp
|
OPS
|
Stored beam and injection
|