Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 7/19/04
|
|
|
0800-0805
|
Record XBPM data for user orbit with TopUp running
|
OPS
|
SR Beam
|
0805-0900
|
Waveguide switch from RF3/RF4 to RF2/RF4
|
RF Group
|
No Beam
|
0805-1000
|
Upgrade power supply for MPEOB strobe in Zone C
|
McNamara
|
No Beam
|
0805-1000
|
Swap out Corrector power supplies in Zone C for Reg upgrade
|
McNamara
|
No Beam
|
0805-1000
|
Install and test a fix for the A:H3 corrector problem
|
Lenkszus
|
No Beam
|
0805-0900
|
Reboot iocs40fb with a database that supports automated reflective memory testing
|
Lenkszus
|
No Beam
|
0805-1000
|
Test DACI software with SR PSCU
|
Hillman
|
No Beam
|
0805-1000
|
Test the K1 relay a potential external interlock problem with the Raws supplies starting in sector 6:7 and 36:37
|
Sprau
|
No Beam
|
0900-1200
|
Wireless testing Bldg. 420
|
Stejskal
|
No Impact?
|
0805-0900
|
Install TLD Badges in the LEUTL Tunnel on the Beam pipe
|
Vacca
|
No impact
|
0805-0900
|
Replace Gespac ADC board for the RF Gun Heater supply
|
Hillman
|
No Inj
|
0805-0930
|
Reboot linac iocs: ioclirfgun, ioclic1, ioclic4 to add pvs to monitor PS setpoint changes relative to conditioning
|
Varotto
|
No Inj
|
0830-1030
|
Test cables and replace Filter comparators at 10BP2, 15BP2, and 15BP3
|
Erwin
|
Access
Zone B
|
0830-0930
|
Reboot iocs3VP to incorporate vacuum pump database additions
|
Quock
|
No Beam
|
0830-1030
|
Terminate existing ACIS Cable and Power Cable for a future Radiation Monitor at the 26-ID Ratchet Door Column
|
Vacca, Forrestal
|
No Beam
|
0830-0930
|
Reboot iocfe31
|
M. Smith
|
No Beam
|
0830-0930
|
Replace red beacon at L1:MO:PF
|
Cours
|
No Inj
|
0830-0930
|
Replace rf source backup generator
|
Cherbak
|
No Beam
|
0830-1230
|
Replace the BOOSTER TO LEUTL radiation stop solenoid air manifold, verify the wiring of the ACIS limit switches, perform a `mini' validation of the affected ACIS
|
Markovich, Gagliano
|
Access
Booster (AA mode)
|
0830-1130
|
Replace burnt out magnet strobes lights
|
Hillman
|
Access
Booster
|
0830-1000
|
Bob Keithley to obtain measurements of BTX beamline for future ODR test station
|
Lumpkin
|
Access Booster
|
0845-1000
|
Check operation of PS2 at 18ID front end. Requires PSS validation of switches on PS2
|
Gagliano
|
Access
Zone C
(AA mode)
|
0930-1130
|
Operator Training - PAR(0700-1500)
|
Glenn, Jones
|
No Inj
|
0900-1000
|
Replace Rotary Encoder on upstream end of the 3IDds Insertion Device
|
Merritt
|
Access
Zone A
|
0900-1000
|
Reboot siocops (soft ioc) to load sequence program to automate testing of reflective memory.
|
Varotto
|
No Impact
|
0900-1000
|
Add bus analyzer board to sector 5 (iocs5vp) to collect data
|
Varotto
|
No Impact
|
0900-0930
|
Remove the VTM200 10/100Mb media converter undergoing field testing at iocs1bpm and restore connections to the Cabletron Ethernet media converter
|
Laird
|
No Beam
|
1000-1130
|
Test cable and replace Filter comparator at 35BP2
|
Erwin
|
Access
Zone E
|
1000-1030
|
Install cable in iocmtime racks to bring P0 to timing patch panel
|
Lenkszus
|
No Beam
|
1230-1300
|
Beam recovery.
|
OPS
|
Stored beam and injection
|
1300-1500
|
Reproduce Nan problem with controllaw.
|
Emery Lenkszus
|
Stored beam nad injection
|
1500-1600
|
CPU mode testing.
|
Smith Emery
|
Stored beam and injection
|
1600-1700
|
Test servo motor.
|
Stein Xu Sajaev
|
Stored beam and injection
|
1700-2100
|
Collect nbbpm spectrum. Parallel to RF phase...
|
Sun
|
Stored beam, no injection
|
1700-2100
|
RF phase anf timing jitter measurements in linac.
|
Borland
|
No injection
|
2100-2400
|
BPM tests.
|
Singh
|
Stored beam and injection
|
|
Tuesday, 7/20/04
|
|
|
0000-0600
|
Canted undulator xbpm studies.
|
Decker
|
Stored beam and injection
|
0600-0900
|
Prepare for 1296 bunches test.
|
Sereno Harkay Sajaev Decker et al.
|
Stored beam and injection
|
0900-1700
|
1296 bunch mode test with shutters open. Floor coordinator support required.
|
Randall
|
Stored beam and injection
|
1000-1200
|
Operator Training - Linac (0700-1500) can be concurrent to the User portion of 1296 bunch operation
|
Lesson, Jones
|
No injection
|
1700-2100
|
Bunch purity study.
|
Sereno Borland
|
Stored beam and injection
|
2100-2400
|
Bunch purity vs. number of bunches study.
|
Sereno
|
Stored beam and injection
|
|
Wednesday, 7/21/04
|
|
|
0000-0700
|
Xbpm alignment work.
|
Decker
|
Stored beam and injection
|
0100-0300
|
Operator Training - Booster. Parallel to xbpm alignment.
|
Forth
|
Limited Inj
|
0700-0800
|
Ready for 0+24X1 fill pattern, low emittance, TopUp
|
OPS
|
Stored beam and injection
|