Machine Studies

Schedule for Run03-1, 2004

September 28th, 0800 - October 5th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 9/28/04

 

 

0800-1300

BPLD Validation

Pietryla, Bui

Stored Beam & Inj

1300-1700

ID Xbpm test

Hahne

Stored Beam

1300-1500

Operator Training - Booster (0800-1500)

Glenn

Limited Inj

1700-2300

Orbit Recovery

Singh

Stored Beam

1700-2000

Commission new Linac Controllaw

Sereno

Inj Available

2300-0000

Response matric measurements

Sajaev

Stored Beam

2300-0000

Operator Training - Linac (2300-0700)

Gagliano

Limited Inj

 

Wednesday, 9/29/04

 

 

0000-0100

Response matrix measurements

Sajaev

Stored Beam & Inj

0000-0100

Operator Training - Linac (2300-0700)

Gagliano

Limited Inj

0100-0500

Dynamic aperture measurement with sextupole turned off (I)

Emery, Sajaev

Stored beam & inj.

0500-0700

Operator Training - SR (2300-0700)

Forth

Stored Beam & Inj

0800-1600

Full operational test of the FE and beamline shutters, under normal PSS operation

Hawkins, Gagliano, Salazar

No Beam

0800-1100

Investigate SR Raws' K1 relay wiring

Puttkammer

No Beam

0800-1000

Operator Training - Booster

Grodecki

No Beam

0830-0930

Check leaking gearbox oil seal on the ID in Sector 23 upstream

Grimmer

Access
Zone D

0830-0900

Replace gearbox in Sector 24 Upstream Insertion Device

Grimmer

Access Zone D

0830-0930

Install a radiation dosimetry plate on the upstream end of the 3ID upstream device

Grimmer

Access
Zone A

0900-1100

Test iocs1fb power cycle reboot.

Lenkszus

No Beam

1000-1200

PAR ACO Re-qualification

Ronzhin

No Beam

1200-1400

Operator Training - Booster

Glenn

No Beam

1300-1400

SR Power Supply Calibration

Puttkammer

No Beam

1600-1800

RTFB test with with nbbpm

Singh, Bui

Stored Beam

1600-1900

Set-up 35-BM Pinhole Camera for Machine Studies

Yang

Stored Beam & No Inj.

2000-2400

Commission new Booster Sextupole Config

Sereno

Stored Beam

 

Thursday, 9/30/04

 

 

2400-0200

Beta function correction

Sajaev

Stored Beam & Inj.

0200-0400

Operator Training - SR (2300-0700)

Forth

Stored Beam & Inj

0400-0600

Operator Training - Linac (2300-0700)

Gagliano

Limited Inj

0600-1000

Xbpm gap scans

Hahne

Stored Beam

0800-1000

Operator Training - Booster (0700-1500)

Grodecki

Limited Inj

1000-1400

Nonlinear beam dynamics measurements

Sajaev, Emery

Stored Beam & Inj.

1400-1600

Injection betatron oscillation characterization

Emery

Stored Beam & Inj.

1600-2400

OTR/ODR Diagnostic Comissioning

Sereno, Vacca, Lumpkin

Stored Beam & No Inj.

 

Friday, 10/1/04

 

 

0200-0400

Operator Training - SR (2300-0700)

Forth

Stored Beam & Inj

0400-0600

Operator Training - Linac (2300-0700)

Gagliano

Limited Inj

0600-1000

DBPLD beam status tests

Singh, Bui

Stored Beam & Inj.

1000-1200

Operator Training - Booster (0700-1500)

Glenn

Limited Inj

1200-1800

Imaging of vertical kicker induced beam motion

Yang, Harkay, Guo

Stored Beam & Inj.

1800-2400

HOM Studies

Harkay, et al

Stored Beam & Inj.

 

Saturday, 10/2/04

 

 

0500-0900

HOM mode damper studies

Emery

 

0900-1300

Fast corr. step response

Singh

Lenkszus

Emery

Stored beam

1300-1900

Commission PTB Sband bpm for direct injection

Sereno

No inj.

1900-2400

CPU coupling correction

Emery

 

 

Sunday, 10/3/04

 

 

0000-0200

Linac Re-qualification (0000-1100)

Sutton

No Inj

0800-1200

Dynamic aperture measurement with sextupole turned off (II)

Emery

Sajaev

Stored beam & inj.

1200-1800

Beam Parameter Measurement

Chae,Sajaev, Yao, Yang

Stored beam &Inj.

1800-2200

Commissioning PAR bunch cleaning upgrade

Yao

Stored beam

1800-2000

Setup 35-BM pinhole camera for User run

Yang

Stored beam

2200-2400

Xbpm studies

Decker

Stored Beam & Inj.

 

Monday, 10/4/04

 

 

0000-0600

Xbpm studies

Decker

Stored Beam & Inj.

0600-0700

Corrector punch down

Singh

Stored Beam & Inj.

0700-1300

Fast Corr. frequency Response

Diag group

PS group

Lenkszus

Emery

Stored Beam

& limited injection

0800-1000

Operator Training - Booster (0700-1500)

Grodecki

Limited Inj

1100-1300

PAR ACO Re-qualification (0700-1500)

LaBuda

No Inj

1240-1330

Zone A Access to install dosimeter on 4ID insertion device

Petra

No beam

1330-1700

Impedance Center Measurement

Chae, Yao

Stored Beam & Inj.

1700-2200

Par bunch cleaning system study

Yao

Stored Beam &Inj

1700-1900

Test the users triggering of the CPU ID

Smith

Stored Beam

2200-0000

Xbpm studies

Decker

Stored Beam &Inj

 

Tuesday, 10/5/04

 

 

0000-0600

Xbpm studies

Decker

Stored Beam &Inj

0600-0800

Ready for 0+324X1 fill pattern, low emittance, Non-TopUp

OPS

Stored Beam & Inj